background image

MO-1

MO-2

MO-3

MO-4

MO-6

MO-9

INSTRUCTION MANUAL

Ecosoft MO MIDI systems

Содержание MO 6-36M

Страница 1: ...MO 1 MO 2 MO 3 MO 4 MO 6 MO 9 INSTRUCTION MANUAL Ecosoft MO MIDI systems...

Страница 2: ......

Страница 3: ...2 Technical data 56 3 Operating modes 58 4 Program 62 Annex A Bypass valve P IDs 67 Annex B Operation record 68 This appliance is not intended for use by persons including children with reduced physic...

Страница 4: ...remove particles The water may be dosed with antiscalant or other RO chemicals with a dosing pump at this point Then high pressure pump feeds the water into the membrane module or membrane array in w...

Страница 5: ...witches float switch permeate conductivity and temperature and external inhibition Depending on these signals it chooses to run in service rinse membranes go to standby or go to fault mode Permeate co...

Страница 6: ...12 125 200 33 55 95 105 25 28 MO 4 4 5 5 7 270 4 2 6 1 2 2 0 500 DN40 DN25 DN40 25 30 7 8 50 80 13 22 68 75 18 20 MO 3 3 4 5 130 4 1 9 1 0 2 0 450 DN40 DN25 DN40 17 23 4 6 6 75 110 20 30 50 55 13 15...

Страница 7: ...ectrical power 400 V 50 Hz 3 phase Membrane pressure 0 8 1 2 MPa R RO O S SY YS ST TE EM M 3 Installation and startup Caution Electrical installation should only be done by a qualified electrician 3 1...

Страница 8: ...nsert membrane in the pressure vessel brine seal last Central tube of the membrane has to mate with membrane adapter installed at the concentrate end of pressure vessel If necessary remove the lid at...

Страница 9: ...tank verify that the float switch activates and deactivates in the right positions 3 5 If the RO system has permeate rinse enabled install the necessary piping If using service interruption by externa...

Страница 10: ...46 Top DIN rail in the power cabinet Bottom DIN rail in the power cabinet Main circuit breaker Controller circuit breaker Protection relay Pump contactor 3 phase power connection...

Страница 11: ...dule shown on pressure gauge Stop when recycle flow rate meets specification or pressure in the membrane module reaches above upper limit see table of Specifications 3 7 3 Calculate target drain flow...

Страница 12: ...ts After 1 hour of operation start forward flush cycle by pressing START on controller front panel then stop the unit Switch off main circuit breaker Connect permeate tube hose to permeate tank The RO...

Страница 13: ...perator of the unit must strictly follow these guidelines and general electrical safety precautions If power supply cord is damaged it must be replaced by the manufacturer its service agent or similar...

Страница 14: ...ecifications membrane element is irreparably fouled and has to be replaced 5 8 To prevent microbial contamination the unit should be operated for at least 1 hour a day In case 48 hours or longer shutd...

Страница 15: ...tion of the arrow Extract the membrane element by pulling it at the discharge end of the vessel install new membrane element observing flow direction as indicated by the arrow fasten the caps and re c...

Страница 16: ...meet workplace standards Carry out preservative treatment of membrane elements when preparing for an extended downtime The RO machine in its original packaging can be shipped by all types of air sea o...

Страница 17: ...minals of the PCB Other Contact your dealer s product support Main circuit breaker trips Power supply does not meet system requirements The system requires clean power supply conforming to electrical...

Страница 18: ...duct support Water quality does not meet requirements Check that the water analysis conforms with requirements in chapter 2 Damaged brine seal or membrane adapter O ring Contact your dealer s product...

Страница 19: ...ence of any of the conditions indicating risk of damage to the RO machine or improper operation performing hydraulic flushing of membranes forward flush with preset frequency and duration implementing...

Страница 20: ...56 C CO ON NT TR RO OL LL LE ER R 2 Technical data...

Страница 21: ...0A220 3 pole 25 contactor X0 WK6 WK 6 screw terminal X1 X2 WK25UVO WK 2 5 screw terminal External connections Terminals Voltage Leads X0 1 X0 3 400 VAC 3 x 230 VAC 3 phase system power supply X0 N Neu...

Страница 22: ...the circuit will take the controller back to the mode that had been interrupted Stop terminals can be used to connect a microswitch on pre treatment media filter a relay or other means of external co...

Страница 23: ...ansition to Standby after reading high tank level or pressure It can be manually activated while in Service by pushing START button Status of outputs in FF1 High pressure and antiscalant pumps on Entr...

Страница 24: ...mode Pushing START will abort Forward Flush 2 and bring the controller to Service or Standby depending on tank level and backpressure status STANDBY In Standby the unit is stalled and ready to resume...

Страница 25: ...and antiscalant pumps off Entry valve closed Forward flush valve closed Bypass valve closed Alarm on Fault mode can only be quit manually by pushing START Ensure the cause of fault is eliminated befor...

Страница 26: ...ion s 0 sec 4 High pressure pump power during Forward Flush 2 on off off 5 Frequency of periodic Forward Flush in Service h 4 hour 6 Frequency of periodic Forward Flush in Standby h 24 hour 7 Read low...

Страница 27: ...ush 1 duration Enter length of Forward Flush 1 0 255 seconds Forward Flush 1 will not be performed if the parameter is set to zero 1 3 Forward Flush 2 duration Enter length of Forward Flush 2 0 255 se...

Страница 28: ...1 Permeate backpressure switch This setting specifies whether backpressure switch is normally closed NC or normally open NO type 1 12 Backpressure Standby delay Specify the length of time before the c...

Страница 29: ...f permeate for correct conductivity measurement Only active if 1 19 is off 1 20 Divide temperature by 10 Temperature value 10 will be shown Only active if 1 19 is set to on 1 21 New settings and calib...

Страница 30: ...e by holding STOP for 8 seconds then skipping Settings and Calibration prompt displays Enter Maintenance passcode in the prompt Factory passcode is 0000 3 1 Schedule maintenance stop Select on to turn...

Страница 31: ...osing pump 5 High Pressure pump 6 purified water pump 7 sediment prefilter 8 membrane module 9 permeate tank 10 drain flow control 11 recycle flow control 12 HP pump bypass valve Legend 1 entry valve...

Страница 32: ...8 A AN NN NE EX X B B Operation record Ecosoft RO Operation record Date and time Water temperature Pressure Flow Pump bypass Water supply After sediment filter In membrane module Permeate Recycle Drai...

Страница 33: ...nstruments performance 2 1 Controller programming 2 2 Low feed pressure switch 2 2 1 Trip point MPa 2 2 2 Delay s 2 3 High feed pressure switch 2 3 1 Trip point MPa 2 3 2 Delay s 2 4 High permeate pre...

Страница 34: ......

Отзывы: