![Ecolab Elados EMP KKS E60 Скачать руководство пользователя страница 172](http://html.mh-extra.com/html/ecolab/elados-emp-kks-e60/elados-emp-kks-e60_operating-instructions-manual_2354530172.webp)
7.1.3
Connection of pressure line
Fig. 10: Connection of pressure line
n
Cut off the metering hose or pipe straight.
n
Push over the union nut (pos. 2) and crimping ring (pos. 3).
n
Attach the hose or the pipe onto the connection piece (pos. 4) until the stop motion
and screw it up by hand.
n
Adjust angled position by loosening and screwing down the nut again (pos. 1).
CAUTION!
Observe max. permissible operation pressure of metering hose/pipe!
NOTICE!
After 24 hours of operation, screw down diagonally the metering head screws
to 3 - 4 Nm.
CAUTION!
Observe max. permissible operation pressure of metering hose/pipe!
7.2
Electrical installation
7.2.1
Inputs and outputs
Electrical installation: Inputs and outputs
The inputs and outputs are equipped with protective caps in
the as-delivered condition. These caps must be removed when
necessary. (pos. I-VIII)
Device installation
36
417101442 Rev. 12-02.2019
Содержание Elados EMP KKS E60
Страница 2: ......
Страница 123: ...14 2 Abmessungen Abb 89 Abmessungen Technische Daten 121 417101442 Rev 12 02 2019 ...
Страница 134: ...16 Konformitätserklärung Abb 95 Konformitätserklärung Konformitätserklärung 132 417101442 Rev 12 02 2019 ...
Страница 135: ......
Страница 258: ...14 2 Dimensions Fig 90 Dimensions Technical Specifications 122 417101442 Rev 12 02 2019 ...
Страница 269: ...16 Declaration of Conformity Fig 96 Declaration of Conformity Declaration of Conformity 133 417101442 Rev 12 02 2019 ...
Страница 393: ...14 2 Dimensions Fig 93 Dimensions Données techniques 123 417101442 Rev 12 02 2019 ...
Страница 404: ...16 Déclaration de conformité Fig 99 Déclaration de conformité Déclaration de conformité 134 417101442 Rev 12 02 2019 ...
Страница 405: ......