9.2.4
Replacing the pump head and diaphragm
Fig. 22: Replacing the pump head and diaphragm
1
Cover plate
2
Metering head screws (4 off)
3
Pump head
4
Diaphragm
5
Support disk (not at 2.5 l/h)
6
Intermediate plate
7
Bellows
1.
Remove the cover plate (pos. 1) on the metering head
2.
Loosen the metering head screws (pos. 2).
3.
Remove the pump head (pos. 3).
4.
Unscrew the diaphragm (pos. 4), intermediate plate (pos. 6)
and support disk (pos. 5).
5.
Remove the bellows (pos. 7) from the plunger.
6.
Install the new bellows in the correct position, pos. 7.
7.
Place in the intermediate plate in the correct position, pos. 6.
8.
Slide the support disk in the correct position (concave side facing the diaphragm)
over the thread of the diaphragm.
9.
Install new diaphragms and support disk.
CAUTION!
Only tighten diaphragms by hand and do not use a tool!
10.
Turn the intermediate plate clockwise until the diaphragm rupture drain faces down.
11.
Mount the pump head and pay attention to the direction of flow, pos. 3.
12.
Hand-tighten the pump head screws and then tighten them cross-wise.
CAUTION!
Tightening torque for metering head screws = 3 - 4 Nm.
Check the torque after 24 hours!
13.
Mount the cover plate on the pump head.
Maintenance
47
417101964 Rev. 4-04.2019
Содержание 141277
Страница 2: ......
Страница 60: ...12 1 Abmessungen Abb 25 Artikel Nr 141277 Abb 26 Artikel Nr 141278 Technische Daten 58 417101964 Rev 4 04 2019...
Страница 71: ...DN20 DN25 DN40 EMP Kompakt II Operating instructions EMP Kompakt II 417101964 Rev 4 04 2019 23 04 2019 ENGLISH...
Страница 127: ...12 1 Dimensions Fig 25 Article No 141277 Fig 26 Article No 141278 Technical data 57 417101964 Rev 4 04 2019...
Страница 137: ...67 417101964 Rev 4 04 2019...
Страница 139: ...DN20 DN25 DN40 EMP Kompakt II Manuel d utilisation EMP Kompakt II 417101964 Rev 4 04 2019 23 04 2019 FRANCAIS...
Страница 198: ...12 1 Dimensions Fig 25 Artikel Nr 141277 Fig 26 Artikel Nr 141278 Caract ristiques techniques 60 417101964 Rev 4 04 2019...