![Ecolab 106052 Скачать руководство пользователя страница 65](http://html1.mh-extra.com/html/ecolab/106052/106052_operating-instructions-manual_2354518065.webp)
1.10
Terms of warranty
The manufacturer only guarantees under the following conditions:
n
Assembly, connection, adjustment, maintenance and repairs must be carried out by
qualified and authorised specialists with the aid of this operating instructions and all
instructions of delivered and build in components.
n
All maintenance and service intervals of all components of this installation must be
observed and documented.
n
The installation may only be used in accordance with this operating instruction.
n
Only genuine replacement parts are to be used for repairs.
The pump is built according to current standards, guidelines and also tested
and certified according to the CE-Regulations.
The pump left our premises in absolutely perfect condition. To keep the
equipment in this condition and to ensure risk-free operation, all indications,
warnings and maintenance instructions contained in these operating instruction
and all instructions of the associated system components, or which are
attached on the components, must be observed.
In addition, the general warranty and service conditions of the
manufacturer apply!
1.11
Manufacturer's service and contact address
Ecolab Engineering GmbH
Raiffeisenstraße 7
D-83313 Siegsdorf, Germany
Telephone (+49) 86 62 / 61 0
Fax (+49) 86 62 / 61 166
Email: [email protected]
http://www.ecolab-engineering.com
General remarks
10
Rev. 5-06.2018
Содержание 106052
Страница 2: ......
Страница 3: ...Membran Dosierpumpe Turbo SMART II Betriebsanleitung 417102229 EcoAdd Rev 5 06 2018 26 06 2018 GERMAN...
Страница 36: ...Kennlinien Das Potentiometer hat eine progressive Kennlinie Abb 10 Kennlinien Inbetriebnahme 34 Rev 5 06 2018...
Страница 43: ...8 3 3 Abst nde Mehrfach Installation lange U Verbinder Technische Daten 41 Rev 5 06 2018...
Страница 54: ......
Страница 56: ...Diaphragm Dosing Pump Turbo SMART II Operating instructions 417102229 EcoAdd Rev 5 06 2018 26 06 2018 ENGLISH...
Страница 96: ...8 3 3 Spacing multiple installation with long U connectors Technical Data 41 Rev 5 06 2018...
Страница 107: ......