
© 2018 EcoAir 10 All rights reserved
Eng
lish
STEP 1. ASSEMBLE THE POWER LEAD HOOK
AT THE BACK OF THE APPLIANCE
Use screws to fix the power lead hook at the
back of the appliance as shown below.
INSTALLATION
INSTALLATION OF POWER LEAD HOOK
STEP 2. WIND THE POWER LEAD AROUND THE
HOOK
When you are not using the appliance wind the
power lead around the hook as shown below.
BOTTOM DRAINAGE PORT FOR USE BEFORE STORAGE & WHEN FULL TANK LIGHT IS ON
* Before Storage we recommend you drain the internal storage tanks using this drainage port.
Direction of the Power Lead
Hook
Direction of the Power Lead
Hook
Screws
Power Lead
Hook
INSTALLATION OF DRAINAGE
STEP 1. Remove the rubber plug from the bottom
drainage port.
STEP 2. Attach the drain hose pipe clamp to the back pan-
el of the appliance near the bottom drainage port with the
screw provided.
STEP 3. Attach one end of the drainage pipe to the
drainage port with the pipe clip.
Make sure the hose is fully inserted into the drainage
port.
Put the rubber plug into the other side of drainage
pipe, fix it with pipe clip and then fix it into the drain-
age pipe clamp.
Bottom drainage port
Screw
Drainage
pipe clamp
Drainage pipe
Drainage clip
Drainage pipe
clamp
Pipe clip
Rubber Plug