
© 2018 EcoAir 9 All rights reserved
Eng
lish
INSTALLATION
joint A
joint B
joint C
discharge pipe
power lead hook (2)
Screw not included
pipe clamp
rubber plug
pipe clip
Bottom drainage pipe
battery (2) (AAA 1.5V)
remote control
user manual
drainage connector
PACKAGE CONTAINS
Note: check if the accessories are available before installation.
TOOLS NEEDED FOR INSTALLATION
cross screwdriver
straight screwdriver
saw
measurement tape
scissors
pencil