manualshive.com logo in svg
background image

X7507840001

© 10/2019 ECHO Inc.

Operator’s 

Manual

RB-60

Broadcast 

Spreader

Содержание RB-60

Страница 1: ...X7507840001 10 2019 ECHO Inc Operator s Manual RB 60 Broadcast Spreader ...

Страница 2: ...ctions before using Cancer and Reproductive Harm www P65Warnings ca gov Do not allow anyone to operate the broadcast spreader without proper instructions Do not permit children to operate the broadcast spreader Wear protective eyewear and gloves when handling and applying lawn and garden chemicals Read and follow the chemical label instructions and warnings for handling and applying the chemicals ...

Страница 3: ...icaciones más precisos Please refer to the instructions on the material you re spreading for the most accurate application setting requirements Referez vous aux instructions reliées au matériel que vous désirez rependre afin d effectuer le réglage optimal pour ce matériel Instructions Instrucciones Fill hopper llenar la tolva Remplir le trémie With spreader gate closed fill spreader hopper Con la ...

Страница 4: ...mbly may be necessary After opening the carton check for damage Immediately notify your retailer or ECHO Dealer of damaged or missing parts Use the contents list to check for missing parts ASSEMBLY Install Handle Brackets 1 Align holes in top handle bracket A with holes in bottom handle bracket B 1 Broadcast Spreader Asembly 2 Carriage Bolts 2 Wing Nuts 1 Quick Start Guide A B ...

Страница 5: ... on each side Note Attach each side loosely before tightening brackets securely Assure control cable is routed behind handle brackets OPERATION Application Instructions TIP HAZARD Unit can tip on uneven ground Always fill hopper on flat ground and keep bystanders away Otherwise personal injury could result C D ...

Страница 6: ... application setting requirements 3 Application A Lower edge guard C and make perimeter pass to protect non lawn areas Pull actuator handle to open gate while spreading B Raise edge guard Make parallel internal passes to ensure even coverage A B C C Setting Ajuste Réglage 5 5 5 5 5 5 5 5 5 6 6 6 Setting comparison chart Cuadro comparativo Régler selon la charte de comparaison Setting by granular s...

Страница 7: ... each use Sample Spread Pattern Muestra del patrón de disribución Modèle d épandage typ e SHUT OFF HERE Apague aquí Arrêt ici SHUT OFF HERE Apague aquí Arrêt ici START Inicio Mise en marche RESTART Reinicie Remise en marche RESTART Reinicie Remise en marche RESTART Reinicie Remise en marche RESTART Reinicie Remise en marche SHUT OFF HERE Apague aquí Arrêt ici SHUT OFF HERE Apague aquí Arrêt ici ...

Страница 8: ... Inc Check Tire Pressure Tires should be inflated to 15 psi Assure tire pressure does not exceed 30 psi Replacing Control Cable 1 Remove Shield A 2 Turn gate B clockwise to relieve tension on cable 3 Remove cable S hook C from gate C A B C C C C ...

Страница 9: ...Inc 4 Remove upper handle bracket from lower handle bracket 5 Remove bolts D and separate handle halves 6 Install new handle half with control cable assembly 7 Re assemble spreader components Assure control cable is routed behind handle brackets D ...

Страница 10: ... contact you in the unlikely event of a service update or product recall and verifies your ownership for warranty consideration If you do not have access to the Internet you can complete the form below and mail to ECHO Inc Product Registration PO Box 1139 Lake Zurich IL 60047 MODEL RB 60 Length 959 mm 37 75 in Width 584 mm 23 in Height 794 mm 31 25 in Weight 10 2 kg 22 4 lb Capacity Weight 27 2 kg...

Страница 11: ...RB 60 PRODUCT REGISTRATION X7507840001 11 10 2019 ECHO Inc ...

Страница 12: ...ECHO INCORPORATED 400 Oakwood Road Lake Zurich IL 60047 www echo usa com N29000001001 N29000999999 ...

Отзывы: