8
Before you start
Before you start
Packing list
Assembly
Attachment shaft assembly
1. Set power head/shaft assembly on a level surface.
2. Pull locator pin (A) out, and turn anticlockwise 1/4 turn to
lockout position.
3. Remove cardboard spacer, if necessary.
The following parts are packed separately in the packing box.
When you have unpacked the box, please check the parts that it contains.
Contact your dealer if anything is missing or broken.
1. Drive shaft and cutting attachment
2. Guide bar cover
3. Socket
wrench
4. Storage
hook
assembly
5. Operator's
manual
WARNING
Read the operator's manual carefully to ensure that you assemble the product correctly.
Using a product that has been incorrectly assembled could lead to an accident or serious injury.
Содержание MTA-PP/E
Страница 2: ......
Страница 21: ...19 1Notes and rear cover MEMORANDUM ...
Страница 65: ...21 1Notizen und hintere Umschlagseite NOTIZEN ...
Страница 106: ...X771 001330 X771209 5001 2018 1 7 2 Suehirocho Ohme Tokio 198 8760 JAPÓN TELÉFONO 81 428 32 6118 FAX 81 428 32 6145 ...
Страница 107: ......
Страница 108: ...X771 001330 X771209 5001 2018 1 1 7 2 Suehirocho Ohme Tokyo 198 8760 JAPAN PHONE 81 428 32 6118 FAX 81 428 32 6145 ...