Chengdu Ebyte Electronic Technology Co.,Ltd
Copyright ©2012–2019
,
Chengdu Ebyte Electronic Technology Co.,Ltd
16
Figure 6-3
Then enter “AT+RSTART” to restart the device with a line break. The normal node configuration is complete.
As shown in Figure 6-4:
Figure 6-4
Data transmission after network access
When the configuration is complete, the coordinator restarts and the LINK pin is set low level, indicating that the
coordinator has started and is running. After an normal node device starts up, it will have a network access time of 5 to
20 seconds. When the network access is completed, the LINK pin will be set to low level, indicating that the network
access is successful.
Data transmission is shown as follow:
The coordinator and node devices can communicate with each other normally.
9. AT Command
When the serial port enters AT mode, it needs to open the serial port assistant, set the serial port (default parameter)
baud rate 115200, data bit 8 bit, stop bit 1 bit, input "+++" without Enter. All parameter settings will reply "\r\n+OK\r\n".
Содержание E70-915NW14S
Страница 1: ...E70 915NW14S User Manual...