background image

 

 

Quick Guide - SBU IO-Link 
 

 

 

 
Page 3 of 10 

 

                 

 

A) 

General information 

 

A01 

Information about these Quick Guide 

 

 

These Quick Guide provide important information on handling the SBU IO-Link and assist with the fast commissioning 
of the SBU IO-Link.  

 

 
All information in these operating instructions are based on the information on the properties of the product described 
here and the corresponding safety regulations available at the time of going to press. 

 

 
The manufacturer reserves the right to make changes and modifications within the scope of the legal regulations and 
in the interests of improving the properties of the product. 

 

 
These Quick Guide are intended as a package leaflet for the purchased product SBU IO-Link and are not a 
replacement for the original assembly instructions. The original assembly instructions can be downloaded from our 
websit

www.ebro-armaturen.com

. These original assembly instructions as well as all other information necessary for 

safe use must be available to all persons who use the SBU IO-Link at the time of mounting/dismounting and during 
operation. The SBU IO-Link  may neither be mounted nor used without these short operating instructions and the 
original assembly instructions having been read and understood and being ready to hand at the place of use. 

A02 

Explanation of symbols 

Information is marked in these instructions by symbols:  

 

xxxxx 

Danger / Caution / Warning

  

…  indicates  a  dangerous  situation  that  can  lead  to  the  death  of,  or  serious  injuries  to 
persons and/or damage to the piping system. 

 

Note

 

… indicates an instruction that must be observed without fail. 

 

Information 

… provides useful hints and recommendations  

If these information, caution and warning notes are not heeded, this can lead to dangerous situations and render the 
manufacturer's warranty void. 

Содержание SBU IO-Link

Страница 1: ...ns not all possible type variants are shown Quick Guide in accordance with the EU RED Directive 2014 53 EU in accordance with the EC Machinery Directive 2006 42 EC English language version Revision 00...

Страница 2: ...5 B02 MOUNTING THE SBU IO LINK ON THE QUARTER TURN ACTUATOR 5 B03 ELECTRICAL CONNECTION 6 B04 COMMISSIONING 6 B05 ERRORS IN GENERAL 8 B07 ERRORS CAUSE REMEDIAL ACTION 8 D STORAGE PACKAGING AND TRANSP...

Страница 3: ...ly instructions can be downloaded from our website www ebro armaturen com These original assembly instructions as well as all other information necessary for safe use must be available to all persons...

Страница 4: ...ers The SBU IO Link is suitable only for the non explosive zone and may be operated only with a 24 V DC power supply The SBU IO Link is used only in an area that is not potentially explosive The SBU I...

Страница 5: ...are required for all other interfaces The SBU IO Link may only be operated with the accessories foreseen and approved by EBRO ARMATUREN Gebr Br er GmbH The SBU IO Link should be mounted as follows Un...

Страница 6: ...The associated circuit diagram is affixed inside the inner housing cover Connect the SBU IO Link in accordance with the permissible voltage All electrical connections to the user side controller are t...

Страница 7: ...ly to the respective terminal see wiring diagram J8 Control SV1 Set Not set Control via IO Link external Control via IO Link Control by external signal J9 Control SV2 Set Not set Control via IO Link e...

Страница 8: ...connected properly If the red LED lights up the power supply polarity is reversed Correct polarity of the power supply is signalled by the green LED B06 Collective error Errors are signalled by the f...

Страница 9: ...BU IO Link should be protected against static discharge D02 Packaging The complete SBU IO Link from EBRO ARMATUREN Gebr Br er GmbH is packed safely and fit for purpose in accordance with the transport...

Страница 10: ...Quick Guide SBU IO Link Page 10 of 10...

Отзывы: