Operating instructions

W4E350-DN02-39

Translation of the original operating instructions

5.3.1 Country-specific legal requirements

NOTE
Country-specific legal requirements

Always observe the applicable country-specific legal
regulations with regard to the disposal of products or waste
occurring in the various phases of the life cycle. The
corresponding disposal standards are also to be heeded.

5.3.2 Disassembly

Disassembly of the product must be performed or supervised by
qualified personnel with the appropriate technical knowledge.
The product is to be disassembled into suitable components for disposal
employing standard procedures for motors.

WARNING
Heavy parts of the product may drop off. Some of the
product components are heavy. These components
could drop off during disassembly.

This can result in fatal or serious injury and material damage.
→ Secure components before unfastening to stop them falling.

5.3.3 Component disposal

The products are mostly made of steel, copper, aluminum and plastic.
Metallic materials are generally considered to be fully recyclable.
Separate the components for recycling into the following categories:

Steel and iron

Aluminum

Non-ferrous metal, e.g. motor windings

Plastics, particularly with brominated flame retardants, in accordance
with marking

Insulating materials

Cables and wires

Electronic scrap, e.g. circuit boards

Only ferrite magnets and not rare earth magnets are used in external
rotor motors from ebm-papst Mulfingen GmbH & Co. KG.

;

Ferrite magnets can be disposed of in the same way as normal iron
and steel.

Electrical insulating materials on the product, in cables and wires are
made of similar materials and are therefore to be treated in the same
manner.
The materials concerned are as follows:

Miscellaneous insulators used in the terminal box

Power cables

Cables for internal wiring

Electrolytic capacitors

Dispose of electronic components employing the proper procedures for
electronic scrap.

→ Please contact ebm-papst for any other questions on disposal.

Item no. 12445-5-9970 · ENU · Change 205613 · Approved 2019-11-18 · Page 12 / 12

ebm-papst Mulfingen GmbH & Co. KG · Bachmühle 2 · D-74673 Mulfingen · Phone +49 (0) 7938 81-0 · Fax +49 (0) 7938 81-110 · [email protected] · www.ebmpapst.com

Содержание W4E350-DN02-39

Страница 1: ...ical staff Only authorized specialists are permitted to install the device to carry out a test run and to perform work on the electrical installation 1 3 Basic safety rules 1 1 3 Basic safety rules The safety hazards associated with the device must be assessed again following installation in the final product The locally applicable industrial safety regulations are always to be observed when worki...

Страница 2: ...er installing the device in customer equipment Verify that the entire setup is EMC compliant 1 7 Mechanical movement DANGER Rotating device Risk of injury to body parts coming into contact with the rotor or the impeller Secure the device against accidental contact Before working on the system machine wait until all parts have come to a standstill WARNING Rotating device Long hair and dangling item...

Страница 3: ... unbalanced state e g due to dirt deposits or ice formation Resonant operation operation with severe vibration This also includes vibration transmitted to the fan from the customer installation Operation in medical equipment with a life sustaining or life support function Conveying solids in the flow medium Painting the device Connections e g screws coming loose during operation Opening the termin...

Страница 4: ...s in mm 1 Direction of air flow A 2 Tightening torque 1 5 0 2 Nm 3 Cable diameter min 4 mm max 10 mm tightening torque 1 3 0 2 Nm Item no 12445 5 9970 ENU Change 205613 Approved 2019 11 18 Page 4 12 ebm papst Mulfingen GmbH Co KG Bachmühle 2 D 74673 Mulfingen Phone 49 0 7938 81 0 Fax 49 0 7938 81 110 info1 de ebmpapst com www ebmpapst com ...

Страница 5: ...n Specific ratio 1 pfs 100 000 Pa Data obtained at optimum efficiency level The ErP data is determined using a motor impeller combination in a standardized measurement setup 3 4 Technical description Weight 6 8 kg Size 350 mm Motor size 74 Rotor surface Painted black Terminal box material ABS plastic Blade material PP plastic Fan housing material Sheet steel pre galvanized and coated with black pl...

Страница 6: ...to the device from vibration Bearing damage shorter service life The fan must not be subjected to force or excessive vibration from sections of the installation If the fan is connected to air ducts the connection should be isolated from vibration e g using compensators or similar elements Ensure stress free attachment of the fan to the substructure Check the device for transport damage Damaged dev...

Страница 7: ...ry to connect an additional protective earth conductor by way of the extra protective earth terminal provided on the device 4 2 2 Voltage control NOTE Current overshoots may occur if speed control is implemented by transformers or electronic voltage regulators e g phase control Depending on the type of installation of the device noise and vibration may also occur in the case of phase control Vibra...

Страница 8: ... routing for fans installed upright 4 3 4 Motor protection CAUTION Voltage The device is a built in component and has no disconnecting switch Connect the device to a suitable tripping unit Only connect the device to circuits that can be switched off with an all pole disconnection switch When working on the device secure the system machine in which the device is installed so as to prevent it from b...

Страница 9: ...s 4 4 Connection diagram L U1 blue Z brown N U2 black PE green yellow TOP gray Item no 12445 5 9970 ENU Change 205613 Approved 2019 11 18 Page 9 12 ebm papst Mulfingen GmbH Co KG Bachmühle 2 D 74673 Mulfingen Phone 49 0 7938 81 0 Fax 49 0 7938 81 110 info1 de ebmpapst com www ebmpapst com ...

Страница 10: ...ntire speed control range Severe vibration can arise for instance from inexpert handling transportation damage and resultant imbalance or be caused by component or structural resonance Speed ranges with excessively high vibration levels and possibly resonant frequencies must be determined in the course of fan commissioning Either run through the resonant range as quickly as possible with speed con...

Страница 11: ...nd replace it Repair of load bearing or rotating parts is not permitted Operate the fan for 2 hours at maximum speed so that any water that has ingressed can evaporate If cleaning does not eliminate vibrations the fan may need to be rebalanced To have it rebalanced contact ebm papst The fan is equipped with maintenance free ball bearings The lifetime lubrication of the ball bearings is designed fo...

Страница 12: ...etallic materials are generally considered to be fully recyclable Separate the components for recycling into the following categories Steel and iron Aluminum Non ferrous metal e g motor windings Plastics particularly with brominated flame retardants in accordance with marking Insulating materials Cables and wires Electronic scrap e g circuit boards Only ferrite magnets and not rare earth magnets a...

Отзывы: