background image

Operating instructions

R2E133-RA29-02

Translation of the original operating instructions

2. INTENDED USE

The device is exclusively designed as a built-in device for conveying
air according to its technical data.
Any other usage above and beyond this does not conform with the
intended purpose and constitutes misuse of the device.
Customer equipment must be capable of withstanding the mechanical
and thermal stresses that can arise from this product. This applies for the
entire service life of the equipment in which this product is installed.

Intended use also includes

Conveying air at an ambient air pressure between 800 mbar and
1050 mbar.

Using the device within the permitted ambient temperature range; see
Chapter 3.5 Transport and storage conditions and
Chapter 3.2 Nominal data.

Operating the device with all protective devices.

Following the operating instructions.

Improper use

In particular, operating the device in the following ways is prohibited and
could be hazardous:

Operating the device in an unbalanced state, e.g. due to dirt deposits
or ice formation.

Resonant operation, operation with severe vibration. This also
includes vibration transmitted to the fan from the customer installation.

Operation in medical equipment with a life-sustaining or life-support
function.

Conveying solids in the flow medium.

Painting the device

Connections (e.g. screws) coming loose during operation.

Conveying air that contains abrasive particles.

Conveying highly corrosive air, e.g. salt spray. Exception: devices
designed for salt spray and correspondingly protected.

Conveying air with high dust content, e.g. suctioning off sawdust.

Operating the device close to flammable materials or components.

Operating the device in an explosive atmosphere.

Using the device as a safety component or to perform safety-related
functions.

Operation with completely or partially disassembled or manipulated
protective devices.

In addition, all applications not listed among the intended uses.

Item no. 12184-5-9970 · ENU · Change 218317 · Approved 2020-08-26 · Page 3 / 11

ebm-papst Mulfingen GmbH & Co. KG · Bachmühle 2 · D-74673 Mulfingen · Phone +49 (0) 7938 81-0 · Fax +49 (0) 7938 81-110 · [email protected] · www.ebmpapst.com

Содержание R2E133-RA29-02

Страница 1: ... and otherwise used by suitably qualified trained and authorized technical staff Only authorized specialists are permitted to install the device to carry out a test run and to perform work on the electrical installation 1 3 Basic safety rules 1 1 3 Basic safety rules The safety hazards associated with the device must be assessed again following installation in the final product The locally applica...

Страница 2: ...Before working on the system machine wait until all parts have come to a standstill WARNING Rotating device Long hair and dangling items of clothing jewelry and the like can become entangled and be pulled into the device Injuries can result Do not wear any loose fitting or dangling clothing or jewelry while working on rotating parts Protect long hair with a cap 1 7 Emissions WARNING Depending on t...

Страница 3: ...ting the device in an unbalanced state e g due to dirt deposits or ice formation Resonant operation operation with severe vibration This also includes vibration transmitted to the fan from the customer installation Operation in medical equipment with a life sustaining or life support function Conveying solids in the flow medium Painting the device Connections e g screws coming loose during operati...

Страница 4: ...Accessory part Inlet ring 09566 2 4013 not included in scope of delivery 2 Max clearance for screw 4 mm 3 Cable AWG20 3X 3x crimped splices Item no 12184 5 9970 ENU Change 218317 Approved 2020 08 26 Page 4 11 ebm papst Mulfingen GmbH Co KG Bachmühle 2 D 74673 Mulfingen Phone 49 0 7938 81 0 Fax 49 0 7938 81 110 info1 de ebmpapst com www ebmpapst com ...

Страница 5: ...ion according to intended use Conformity with standards EN 60335 1 CE Approval UL 1004 3 CSA C22 2 No 77 With regard to cyclic speed loads note that the rotating parts of the device are designed for a maximum of one million load cycles If you have special questions consult ebm papst for support Use the device in accordance with its degree of protection Information on surface quality The surfaces o...

Страница 6: ...ure the end of the cable is connected in a dry environment Only connect the device to circuits that can be switched off with an all pole disconnection switch 4 2 1 Requirements Check whether the information on the nameplate matches the connection data If the motor run capacitor was not installed by ebm papst check whether the information on the motor run capacitor matches the information on the na...

Страница 7: ...s external leads Connect the cables according to your application When doing so observe Chapter 4 4 Connection diagram Item no 12184 5 9970 ENU Change 218317 Approved 2020 08 26 Page 7 11 ebm papst Mulfingen GmbH Co KG Bachmühle 2 D 74673 Mulfingen Phone 49 0 7938 81 0 Fax 49 0 7938 81 110 info1 de ebmpapst com www ebmpapst com ...

Страница 8: ...ng instructions 4 4 Connection diagram U1 blue Z brown U2 black Item no 12184 5 9970 ENU Change 218317 Approved 2020 08 26 Page 8 11 ebm papst Mulfingen GmbH Co KG Bachmühle 2 D 74673 Mulfingen Phone 49 0 7938 81 0 Fax 49 0 7938 81 110 info1 de ebmpapst com www ebmpapst com ...

Страница 9: ... CAUSES AND REMEDIES Do not perform any repairs on your device Send the device to ebm papst for repair or replacement WARNING Live terminals and connections even with device switched off Electric shock Wait five minutes after disconnecting the voltage at all poles before opening the device CAUTION Electric charge on capacitor after device is switched off Electric shock risk of injury Discharge the...

Страница 10: ...y 6 months Fasten Insulation of cables for damage Visual inspection At least every 6 months Replace cables Impeller for wear deposits corrosion and damage Visual inspection At least every 6 months Clean impeller or replace device Condensation drainage holes for clogging where necessary Visual inspection At least every 6 months Open holes Abnormal bearing noise acoustic At least every 6 months Repl...

Страница 11: ...materials and are therefore to be treated in the same manner The materials concerned are as follows Miscellaneous insulators used in the terminal box Power cables Cables for internal wiring Electrolytic capacitors Dispose of electronic components employing the proper procedures for electronic scrap Please contact ebm papst for any other questions on disposal Item no 12184 5 9970 ENU Change 218317 ...

Отзывы: