Operating instructions
M3G150-FF21-51
Translation of the original operating instructions
Fig. 1: Recommended stripped lengths in mm (inside terminal box)
Legend: CL = control lines
4.3.2 Connecting wires to terminals
WARNING
Live terminals and connections even with device
switched off
Electric shock
→ Wait five minutes after disconnecting the voltage at all poles
before opening the device.
;
Remove the cap from the cable gland.
Only remove caps where cables are fed in.
;
Equip the cable glands with the seals provided in the terminal box.
;
Route the wire(s) (not included in scope of delivery) into the terminal
box.
;
First connect the "PE" (protective earth).
;
Connect the wires to the corresponding terminals.
Use a screwdriver to do so.
When connecting, ensure that no wire ends fan out.
Fig. 2: Connecting wires to terminals
;
Seal the terminal box.
4.3.3 Cable routing
Water must be prevented from reaching the cable gland along the cable.
NOTE
Damage caused by moisture penetration.
Moisture can penetrate into the terminal box if water is
constantly present at the cable glands.
→ To prevent the constant accumulation of water at the cable
glands, the cable should be routed in a U-shaped loop
wherever possible.
→ If this is not possible, a drip edge can be produced by
fitting a cable tie directly in front of the cable gland for example.
When routing the cable, make sure that the cable glands are located at
the bottom. The cables must always be routed downward.
Item no. 50843-5-9970 · ENU · Change 209539 · Approved 2021-07-15 · Page 10 / 16
ebm-papst Mulfingen GmbH & Co. KG · Bachmühle 2 · D-74673 Mulfingen · Phone +49 (0) 7938 81-0 · Fax +49 (0) 7938 81-110 · [email protected] · www.ebmpapst.com