
7 Guidelines for station planning
7.3 Power supply
144
XI/ON: XNE-GWBR-2ETH-MB
10/2011 MN05002008Z-EN
www.eaton.com
The C-rail can be used as required by the application, for example, as a protective earth (PE).
In this case, the PE connection of each power supply module must be connected to the
mounting rail via an additional PE terminal, which is available as an accessory.
The C-rail is not interrupted by the modules of the XNE ECO-products. It is connected through
the modules’ connection level. But, an access to the C-rail is not possible.
Figure 69:
C-rail side view
Warning
It is permitted to load the C-rail with a maximum of 24 V.
Not
230 V!
Note
For information about introducing a XI/ON station into a ground reference system,
please read Chapter 8, Page 149.
Figure 70:
Using the C-rail
as a protective
earth
23
22
21
13
12
11
23
23
22
22
21
21
13
13
12
12
11
11
23
23
23
22
22
22
21
21
21
13
13
13
12
12
12
11
11
11
24
24
23
23
22
22
21
21
14
14
13
13
12
12
11
11
24
23
22
21
14
13
12
11
TS
SBBC
2 DO
SBC
8 DI
ECO 2 DO
SBC
2 DI
SBB
PF
SBBC
2 DI
2 DO
SBBC
SBC
2 DO
SBC
2 DI
SBB
C-rail (PE)
C-rail (PE)
PE
Klemme
PF
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
GW
IOs
SERVICE
0
1
ADDRESS
20
21
22
23
24
25
26
27
MODE
CFG
off
on
MS
Unlock
end-bracket
befor
e
dismounting
Slide
top
cover
for
configuration
and
service
UL
GNDL
USYS
GNDSYS
!
ETH1
ETH2
Содержание XNE-GWBR-2ETH-MB
Страница 1: ...10 2011 MN05002008Z EN User Manual XI ON XNE GWBR 2ETH MB Gateway...
Страница 8: ...Table of contents 8 XI ON XNE GWBR 2ETH MB 10 2011 MN05002008Z EN www eaton com...
Страница 12: ...1 About this manual 1 3 Overview 12 XI ON XNE GWBR 2ETH MB 10 2011 MN05002008Z EN www eaton com...
Страница 148: ...7 Guidelines for station planning 7 7 Firmware download 148 XI ON XNE GWBR 2ETH MB 10 2011 MN05002008Z EN www eaton com...