xChargeIn
Calibrate the device
Manual for MID variants V1.01
18
© EATON
Schematic measurement setup
Fig. 6-5: Schematic measurement setup
1
... Test device
2
... Supply terminals (L1, L2, L3 and N)
3
... Pulse LED
4
... Charging socket
a
... Test probes (energy source)
b
... Evaluation unit for pulse LED
c
... Test probes (sink)
A test device is connected to the charging station for the measurement. On
the input side, the test probes are connected to the supply terminals. On the
output side, the test probes are inserted into the contacts of the charging
socket. The pulse LED is evaluated with the evaluation unit.