SC300 Handbook
8
Copyright © 2007-2018 Eaton Corporation. All Rights Reserved.
IPN 997-00012-03 B2 Issue B2 July 2018
Starting the SC300
When dc power is applied to the SC300 (via the RXP connector YS11) the start-up sequence begins:
Start-up screen
Main screen
Menu screen
Approx.
120s
Summary screen
The values shown on the Main
Screen are configurable. See
details on page 14. All active
Critical, Major, Minor and
Warning alarms are displayed.
See navigation details on page 11.
If Logon is required see Keypad
Access Security on page 13.