SC100 Handbook
16
Copyright © 2008-2011 Eaton Corporation. All Rights Reserved.
IPN 997-00012-63C August 2011
Information
The following information is available about BCL.
Parameter
Description
Where to find:
State
Indicates if BCL is active or inactive.
SC100: Menu >
Configuration > Battery
Current Limit > Edit
DCTools:
Control Processes > Battery
Current Limit
Engine Run State
Indicates if Engine Run BCL is active.
DCTools:
Control Processes > Battery
Current Limit
Voltage Offset
The bus voltage adjustment made by Battery
Current Limit is applied to the Operating
Voltage to produce the Target Voltage. Target
Voltage is used as the input to the AVC function.
Configuration
Set the following parameters.
Parameter
Description
Where to find:
Battery Capacity
Set to the rated 10 hour capacity of the installed
battery strings. Zero means no battery is
installed.
SC100: Menu >
Configuration > System >
Edit > Battery Capacity
>Edit
DCTools: Batteries
Current Limit
BCL maintains the battery current below this
value, which is a percentage of the installed C10
Battery Capacity.
DCTools: Control Processes
> Battery Current Limit
Engine Run Limit
The Battery Current Limit setting when Engine
Run is active. BCL maintains the battery current
below this value when the engine run digital
input is active (engine run is enabled). This limit
is expressed as a percentage of the installed C10
Battery Capacity.
Battery Test
Battery Test is a preventative maintenance tool that monitors the discharge capabilities to
ensure that the condition of the battery has not deteriorated over time.
The SC100 temporarily reduces the output voltage of the rectifiers to just below the bus voltage
for a set duration. The battery then supplies power to the load. A battery test passes if the
battery voltage remains above a predetermined level for the duration of the test.
Battery Tests can be scheduled to occur at regular intervals, and/or can be started/stopped
manually, and/or can be started by an external relay contact or switch.
Battery Test does
NOT
function during a Fast Charge or Equalize, or during the lock-out period
after an ac supply failure.
If a Digital Input has the function "Start Battery Test" then a Battery Test will start when the
Digital Input becomes active.
Содержание SC100
Страница 18: ...SC100 Handbook 12 Copyright 2008 2011 Eaton Corporation All Rights Reserved IPN 997 00012 63C August 2011...
Страница 51: ...System Operation Copyright 2008 2011 Eaton Corporation All Rights Reserved IPN 997 00012 63C August 2011 45...
Страница 52: ......
Страница 66: ...SC100 Handbook 60 Copyright 2008 2011 Eaton Corporation All Rights Reserved IPN 997 00012 63C August 2011...
Страница 72: ...SC100 Handbook 66 Copyright 2008 2011 Eaton Corporation All Rights Reserved IPN 997 00012 63C August 2011...
Страница 78: ...SC100 Handbook 72 Copyright 2008 2011 Eaton Corporation All Rights Reserved IPN 997 00012 63C August 2011...
Страница 82: ...SC100 Handbook 76 Copyright 2008 2011 Eaton Corporation All Rights Reserved IPN 997 00012 63C August 2011...