UNDERSTANDING MBM OPERATION
Eaton 9395 Maintenance Bypass Module Installation and Operation Manual
S
164201719 Rev 3
www.eaton.com/powerquality
5-5
Battery
Breaker
Input
Breaker
(CB1)
(optional)
E1, E2, E3
E6, E7,
E8, E12
NOTE
Callout letters
A
,
D
,and
E
map to Table 3‐4 on page 3-6, Table 3‐5 on page 3-7, Table 3‐6 on page 3-8, and Table 3‐7 on page 3-9.
NOTE
The
UPS is shown in a simplified view and does not show multiple UPMs.
NOTE
When installing an MBM, a minimum of two separate feeds with upstream feeder breakers, or a single feed with two upstream feeder breakers,
must be provided: one for the UPS and one for the maintenance bypass input. DO NOT use a single feed or a single feeder breaker to supply both the UPS
and the maintenance bypass.
NOTE
If the load requires a neutral, a bypass source neutral must be provided.
9395 UPS CABINET
Backfeed
Contactor (K5)
E9, E10,
E11, E12
Static
Switch
AC Input to
UPS Rectifier
3 Wire A-B-C
Rotation
AC Input to
Bypass
3 or 4 Wire A-B-C
Rotation
Fuse
Service Connector
Battery
Converter
Inverter
Output
Contactor
(K3)
Fuse
Rectifier
Input
Contactor
(K1)
Battery Contactor (K2)
Fuse
Fuse
Fuse
E4. E5
Single-Feed Kit
(Not supplied with the UPS)
BATTERY
CABINET
or
BATTERY
STRING
(Not supplied
with the UPS)
MBM
Maintenance
Bypass Breaker
(MBP)
Maintenance
Isolation Breaker
(MIS)
A
E
AC Output to
Critical Load
AC Input to
Maintenance Bypass
3 or 4 Wire A-B-C
Rotation
E13, E14,
E15, E12
E1, E2,
E3, E12
MIS-1,
MIS-2,
MIS-3,
E12
D
Figure 5‐3. Eaton 9395 MBM without BIB or RIB