UPS System Installation
4-20
Eaton
®
Power Xpert
®
9395P-900 UPS Installation and Operation Manual
P-164000501—Rev 09
www.eaton.com/powerquality
Figure 4-16. ISBM and UPM Section Conduit and Wire Entry Locations
Top Entry Conduit Landing for AC
Input and Output, and DC Input
(Remove panel to drill or punch
conduit holes.)
TOP VIEW
Interface Entry Conduit Landings for TB1
through TB3 Wiring and X-Slot Connections
(Remove panels to drill or punch conduit holes.)
Bottom Entry Conduit Landing for AC
Input and Output, and DC Input
(Remove panel to drill or punch
conduit holes.)
BOTTOM VIEW
Front
Front
Содержание Power Xpert 9395P-900 Series
Страница 2: ......
Страница 8: ...This page intentionally left blank...
Страница 33: ...Section I Installation...
Страница 34: ......
Страница 139: ...Section II Operation...
Страница 140: ......
Страница 231: ......
Страница 232: ...P 164000501 6 P 164000501 9...