Installing Options and Accessories
5-6
Eaton
®
Power Xpert
®
9395P-900 UPS Installation and Operation Manual
P-164000501—Rev 09
www.eaton.com/powerquality
Figure 5-5. Distributed Bypass Pull-Chain Wiring without MOBs
1
2
3
4
5
7
8
6
9
10
UPS 1
Twisted Pair
Twisted Pair
Twisted Pair
Twisted Pair
Twisted Pair
Twisted Pair
1
2
3
4
5
7
8
6
9
10
1
2
3
4
5
7
8
6
9
10
UPS 2
1
2
3
4
5
7
8
6
9
10
1
2
3
4
5
7
8
6
9
10
UPS 3
(If Installed)
1
2
3
4
5
7
8
6
9
10
1
2
3
4
5
7
8
6
9
10
1
2
3
4
5
7
8
6
9
10
Twisted Pair
UPS 4
(If Installed)
TB1
TB1
1
B
T
1
B
T
2
B
T
2
B
T
2
B
T
2
B
T
NOTE
Use twisted pair wiring between the UPS and MOB AUX contacts.
Table 5-3. Pull-Chain Wiring Terminations
From
UPS 1
To
UPS 2
To
UPS 3
(If Installed)
To
UPS 4
(If Installed)
TB2–1
(Pull Chain)
TB2–1
(Pull Chain)
TB2–1
(Pull Chain)
TB2–1
(Pull Chain)
TB2–2
(Pull Chain Common)
TB2–2
(Pull Chain Common)
TB2–2
(Pull Chain Common)
TB2–2
(Pull Chain Common)
Содержание Power Xpert 9395P-900 Series
Страница 2: ......
Страница 8: ...This page intentionally left blank...
Страница 33: ...Section I Installation...
Страница 34: ......
Страница 139: ...Section II Operation...
Страница 140: ......
Страница 231: ......
Страница 232: ...P 164000501 6 P 164000501 9...