Eaton
®
Power Xpert
®
9395P-1200 Installation and Operation Manual 164000500—Rev 11
33
Table 11. 415V Input/Output Ratings and External Wiring Requirements for the Three/Four UPM Models – Separate
Battery
Basic Unit Rating
Units
Rating 50/60 Hz
kVA
kW
675
675
750
750
825
825
900
900
1000
1000
1100
1100
Input and Output Voltage
Volts
415/415 415/415 415/415 415/415 415/415 415/415
AC Input to UPS Rectifier (0.98 Minimum pF)
Full load current plus battery recharge current
(3) Phases, (1) Ground
A
Amps
1156
1284
1412
1541
1712
1883
Minimum Conductor Size
Number per Phase
AWG or kcmil
(each)
500
(5)
500
(6)
500
(6)
500
(6)
500
(8)
500
(8)
AC Input to UPS Bypass (Five Wire)
Full Load Current
(3) Phases, (1) Neutral, (1) Ground
B
Amps
939
1043
1148
1252
1391
1530
Minimum Conductor Size
Number per Phase
AWG or kcmil
(each)
500
(4)
500
(5)
500
(5)
500
(5)
500
(6)
500
(6)
DC Input from Battery Disconnect to Each
UPS UPM
(1) Positive, (1) Negative
C
Amps per UPM
603
603
603
603
603
603
Minimum Conductor Size
Number per Pole
AWG or kcmil
(each)
500
(3)
500
(3)
500
(3)
500
(3)
500
(3)
500
(3)
AC Output to Critical Load (Five Wire)
Full Load Current
(3) Phases, (1) Neutral, (1) Ground
D
Total Amps
939
1043
1148
1252
1391
1530
Minimum Conductor Size
Number per Phase
AWG or kcmil
(each)
500
(4)
500
(5)
500
(5)
500
(5)
500
(6)
500
(6)
NOTE Callout letters
A
,
B
,
C
, and
D
map to
.
NOTE If a 4-pole Automatic Transfer Switch (ATS) is used to connect the UPS to a generator or alternative input source, it may
interrupt the UPS input neutral during its transition between sources. For the 9395 UPS:
The ATS transition must be open in both directions. The "break" time for the contacts must be at least 50 ms. This allows the UPS to
operate properly,
however it is important to evaluate whether the critical load will function properly as its neutral reference is rapidly
(50 ms) switched. Note also that if the UPS load is on bypass, an ATS switchover with interruption of the neutral, will interrupt the
return current path and cause a loss of all phase-to-neutral loads
.
If an overlapping neutral or make-before-break ATS switch is used, the neutrals must overlap for a minimum of 50 ms during the
transition.
Содержание Power Xpert 9395P-1100/1100
Страница 8: ......
Страница 28: ...10 Eaton Power Xpert 9395P 1200 Installation and Operation Manual 164000500 Rev 11 Introduction...
Страница 112: ...94 Eaton Power Xpert 9395P 1200 Installation and Operation Manual 164000500 Rev 11 UPS System Installation...
Страница 154: ...136 Eaton Power Xpert 9395P 1200 Installation and Operation Manual 164000500 Rev 11 Understanding UPS Operation...
Страница 202: ...184 Eaton Power Xpert 9395P 1200 Installation and Operation Manual 164000500 Rev 11 Communication...
Страница 210: ...192 Eaton Power Xpert 9395P 1200 Installation and Operation Manual 164000500 Rev 11 UPS Maintenance...
Страница 214: ...16400050011 164000500 11...