30
Eaton
®
Power Xpert
®
9395P-1200 Installation and Operation Manual 164000500—Rev 11
Table 8. 480V Input/Output Ratings and External Wiring Requirements for the Three UPM – Common Battery
Basic Unit Rating
Units
Rating 50/60 Hz
kVA
kW
675
675
750
750
825
825
900
825
900
900
Input and Output Voltage
Volts
480/480
480/480 480/480
480/480
480/480
AC Input to UPS Rectifier (0.98 Minimum pF)
Full load current plus battery recharge current
(3) Phases, (1) Ground
A
Amps
1002
1113
1225
1225
1336
Minimum Conductor Size
Number per Phase
AWG or kcmil
(each)
500
(6)
500
(6)
500
(6)
500
(6)
500
(6)
AC Input to UPS Bypass
Full Load Current
(3) Phases, (1) Ground
B
Amps
812
902
992
1083
1083
Minimum Conductor Size
Number per Phase
AWG or kcmil
(each)
500
(5)
500
(5)
500
(5)
500
(5)
500
(5)
DC Input from Battery Disconnect to UPS
(3) Phases, (1) Negative
C
Total Amps
1480
1645
1809
1809
1974
Minimum Conductor Size
Number per Pole
AWG or kcmil
(each)
500
(12)
500
(12)
500
(12)
500
(12)
500
(12)
AC Output to Critical Load
Full Load Current
(3) Phases, (1) Ground
D
Total Amps
812
902
992
1083
1083
Minimum Conductor Size
Number per Phase
AWG or kcmil
(each)
500
(5)
500
(5)
500
(5)
500
(5)
500
(5)
NOTE Callout letters
A
,
B
,
C
, and
D
map to
NOTE If a 4-pole Automatic Transfer Switch (ATS) is used to connect the UPS to a generator or alternative input source, it may
interrupt the UPS input neutral during its transition between sources. For the 9395 UPS:
The ATS transition must be open in both directions. The "break" time for the contacts must be at least 50 ms. This allows the UPS to
operate properly,
however it is important to evaluate whether the critical load will function properly as its neutral reference is
rapidly (50 ms) switched. Note also that if the UPS load is on bypass, an ATS switchover with interruption of the neutral, will
interrupt the return current path and cause a loss of all phase-to-neutral loads
.
If an overlapping neutral or make-before-break ATS switch is used, the neutrals must overlap for a minimum of 50 ms during the
transition.
Содержание Power Xpert 9395P-1100/1100
Страница 8: ......
Страница 28: ...10 Eaton Power Xpert 9395P 1200 Installation and Operation Manual 164000500 Rev 11 Introduction...
Страница 112: ...94 Eaton Power Xpert 9395P 1200 Installation and Operation Manual 164000500 Rev 11 UPS System Installation...
Страница 154: ...136 Eaton Power Xpert 9395P 1200 Installation and Operation Manual 164000500 Rev 11 Understanding UPS Operation...
Страница 202: ...184 Eaton Power Xpert 9395P 1200 Installation and Operation Manual 164000500 Rev 11 Communication...
Страница 210: ...192 Eaton Power Xpert 9395P 1200 Installation and Operation Manual 164000500 Rev 11 UPS Maintenance...
Страница 214: ...16400050011 164000500 11...