
98
Eaton
®
Power Xpert
®
9395P-1200 Installation and Operation Manual 164000500—Rev 11
55..22
IInnssttaalllliinngg D
Diissttrriibbuutteedd B
Byyppaassss C
Coonnttrrooll W
Wiirriinngg
NOTE 1
When installing external wiring to the Powerware Hot Sync CAN Bridge Card, conduit
must be installed to the UPS cabinet. When installing internal wiring to the Powerware
Hot Sync CAN Bridge Card terminals, route the wiring through the internal opening in
the X-Slot communication bay.
NOTE 2
When installing interface wiring for the pull chain, conduit must be installed between
UPSs.
To install distributed bypass control wiring:
1.
Verify the UPS system is turned off and all power sources are removed. See
for shutdown instructions.
2.
Perform the procedure listed in paragraph
Installing an Optional Powerware Hot Sync CAN Bridge Card
.
3.
Terminal block TB3 is accessible on the left side of the X-Slot communication bay (see
). To gain
access to terminal block TB1, TB2, and the left interface entry conduit landing plates, remove the screws
securing the top internal safety shield panel and remove the panel. Retain the hardware for later use.
4.
Remove the interface entry conduit landing plates to drill or punch holes (see
5.
Reinstall the interface entry plates and install the conduit.
6.
To locate the appropriate terminals and review the wiring and termination requirements, see paragraph
UPS System Power Wiring Preparation
,
, and
through
7.
Route and install CAN wiring between the UPS cabinets. See
and
for the Powerware
Hot Sync CAN Bridge Card terminal location and
,
, and
for wiring information.
8.
If a tie cabinet with Module Output Breakers (MOBs) is being wired, proceed to Step 11; otherwise,
proceed to Step 9.
9.
Route and install distributed bypass system pull-chain wiring between the UPS cabinets. See
and
for wiring information.
10. Proceed to Step 12.
11. Route and install distributed bypass system pull-chain wiring between the UPS cabinets and tie cabinet
MOBs. See
and
for wiring information.
NOTE
Setup of the Powerware Hot Sync CAN Bridge Card for parallel operation must be
performed by an authorized Eaton Customer Service Engineer. Contact an Eaton service
representative to schedule a date.
12. Reinstall the small top internal safety shield panel and secure with the cabinet mounted screws.
13. Close the front door and secure the latch.
Содержание Power Xpert 9395P-1100/1100
Страница 8: ......
Страница 28: ...10 Eaton Power Xpert 9395P 1200 Installation and Operation Manual 164000500 Rev 11 Introduction...
Страница 112: ...94 Eaton Power Xpert 9395P 1200 Installation and Operation Manual 164000500 Rev 11 UPS System Installation...
Страница 154: ...136 Eaton Power Xpert 9395P 1200 Installation and Operation Manual 164000500 Rev 11 Understanding UPS Operation...
Страница 202: ...184 Eaton Power Xpert 9395P 1200 Installation and Operation Manual 164000500 Rev 11 Communication...
Страница 210: ...192 Eaton Power Xpert 9395P 1200 Installation and Operation Manual 164000500 Rev 11 UPS Maintenance...
Страница 214: ...16400050011 164000500 11...