To install options, accessories, and distributed bypass control wiring, see
Installing Options and Accessories
44..1122
IInniittiiaall S
Sttaarrttuupp
Startup and operational checks must be performed by an authorized Eaton Customer Service Engineer, or the
warranty terms become void (see Section
). This service is offered as part of the sales contract
for the UPS system. Contact an Eaton service representative in advance (usually a two-week notice is required)
to reserve a preferred startup date.
44..1133
C
Coom
mpplleettiinngg tthhee IInnssttaallllaattiioonn C
Chheecckklliisstt
The final step in installing the UPS system is completing the following Installation Checklist.
This checklist ensures that you have completely installed all hardware, cables, and other equipment. Complete
all items listed on the checklist to ensure a smooth installation. Make a copy of the Installation Checklist before
filling it out, and retain the original.
After the installation is complete, an Eaton Customer Service Engineer must verify the operation of the UPS
system and commission it to support the critical load. The service representative cannot perform any
installation tasks other than verifying software and operating setup parameters. Service personnel may request
a copy of the completed Installation Checklist to verify all applicable equipment installations have been
completed.
NOTE
The Installation Checklist MUST be completed prior to starting the UPS system for the
first time.
D
Diissttrriibbuutteedd B
Byyppaassss IInnssttaallllaattiioonn C
Chheecckklliisstt
o
Each cabinet in the distributed bypass system is placed in its installed location.
o
All conduits and cables are properly routed to the UPS cabinets and to the tie cabinet or distribution panel.
o
All power cables are properly sized and terminated.
o
A ground conductor is properly installed.
o
Controller Area Network (CAN) wiring between the UPS cabinets is properly installed.
o
Pull-chain wiring between the UPS cabinets is properly installed.
o
Adequate workspace exists around the UPS cabinets, the tie cabinet, and other cabinets.
o
Startup and operational checks are performed by an authorized Eaton Customer Service Engineer.
Содержание Power Xpert 9395P-1100/1100
Страница 8: ......
Страница 28: ...10 Eaton Power Xpert 9395P 1200 Installation and Operation Manual 164000500 Rev 11 Introduction...
Страница 112: ...94 Eaton Power Xpert 9395P 1200 Installation and Operation Manual 164000500 Rev 11 UPS System Installation...
Страница 154: ...136 Eaton Power Xpert 9395P 1200 Installation and Operation Manual 164000500 Rev 11 Understanding UPS Operation...
Страница 202: ...184 Eaton Power Xpert 9395P 1200 Installation and Operation Manual 164000500 Rev 11 Communication...
Страница 210: ...192 Eaton Power Xpert 9395P 1200 Installation and Operation Manual 164000500 Rev 11 UPS Maintenance...
Страница 214: ...16400050011 164000500 11...