Eaton Power Xpert 9395 UPS Installation and Operation Manual 164201716—Rev 13
49
Figure 15. Conduit and Wire Entry Locations
Top Entry Conduit Landing for AC
Input and Output, and DC Input
(Remove panel to drill or punch
conduit holes.)
TOP VIEW
Interface Entry Conduit Landings for TB1
through TB3 Wiring and X-Slot Connections
(Remove panels to drill or punch conduit
holes.)
Ventilation Grill Debris Shield
(Remove shield before operating
system.)
Bottom Entry Conduit Landing for AC
Input and Output, and DC Input
(Remove panel to drill or punch
conduit holes.)
BOTTOM VIEW
Front
Front
Содержание Power Xpert 9395 275
Страница 1: ...p n 164201716 Revision 13 225 550 kVA Installation and Operation Manual Power Xpert 9395 550 275 UPS...
Страница 8: ......
Страница 18: ...xviii Eaton Power Xpert 9395 UPS Installation and Operation Manual 164201716 Rev 13 List of Figures...
Страница 31: ...10 Eaton Power Xpert 9395 UPS Installation and Operation Manual 164201716 Rev 13 Introduction...
Страница 35: ...14 Eaton Power Xpert 9395 UPS Installation and Operation Manual 164201716 Rev 13 Safety Warnings...
Страница 133: ...112 Eaton Power Xpert 9395 UPS Installation and Operation Manual 164201716 Rev 13 Understanding UPS Operation...
Страница 220: ...Eaton Power Xpert 9395 UPS Installation and Operation Manual 164201716 Rev 13 199 Product Specifications...
Страница 221: ...16420171613 164201716 13...