4 Commissioning
4.1 Hardware enable signal
DX-NET-SWD...
08/14 MN04012009Z-EN
www.eaton.com
29
4 Commissioning
4.1 Hardware enable signal
When running in SmartWire-DT mode, every device needs a hardware
enable signal. In order to provide this enable signal, a high signal must be
applied at digital input 1.
→
Carry out all the commissioning work for the variable frequency
drive/variable speed starter as described in manual
MN04020005Z-EN (for DA1), MN04020003Z-EN (for DC1), or
MN040011EN (for DE1).
→
Check the settings and installations for the connection to the
SmartWire-DT system which are described in this manual.
NOTICE
Make sure that starting the motor will not put anyone or
anything in danger. Disconnect the driven machine if there is a
danger in an incorrect operating state.
L
Figure 22: Hardware enable (left: DA1, center: DC1, right: DE1)
2
DI1
EN
+24 V
12
STO
7
0 V
13
STO
1
+24 V Out
< 100 mA
2
DI1
EN
+24 V
1
+24 V Out
< 100 mA
1
DI1
EN
+10 V
+10 V Out
< 100 mA
Содержание Power XL SmartWire-DT DX-NET-SWD Series
Страница 4: ...II ...
Страница 10: ...0 About this Manual 0 7 Units of measurement 6 DX NET SWD 08 14 MN04012009Z EN www eaton com ...
Страница 32: ...3 Installation 3 3 Install SmartWire DT connection 28 DX NET SWD 08 14 MN04012009Z EN www eaton com ...
Страница 92: ...4 Commissioning 4 6 SmartWire DT diagnostics 88 DX NET SWD 08 14 MN04012009Z EN www eaton com ...