Eaton PDI JCOMM Enclosure Installation and Operation Manual P-164001107—Rev 01
31
Table 7. BCMS Measurements: Normal and Power-KWH Points Lists (Continued)
BCMS Measurements: Normal and Power-KWH Points Lists
BC = branch circuit, PB = panelboard
Power Factor phase C
PB power measurement
Energy Consumption, KWH
PB power measurement
Total Harmonic Distortion, Voltage Source 1
PB power measurement; only provided if THD option was checked during “Set
BCMS Options”
Total Harmonic Distortion, Voltage Source 2
PB power measurement; only provided if THD option was checked during “Set
BCMS Options”
Table 8. BCMS Alarm and Warning Configuration: Normal and Power-KWH Points Lists
BCMS Alarm and Warning Configuration: Normal and Power-KWH Points Lists
BC = branch circuit, PB = panelboard
Global Settings for Branch Circuits
Note: Both
Normal
and
Power-KWH
points lists allow branch circuit breaker size and warning/alarm thresholds to be set
globally (uniformly) for all branch circuits.
Breaker size, set uniformly for all branch
circuits (BC 1-42)
Default BC breaker size is 20A. Branch circuit warnings and alarm thresholds are
based on breaker size.
Warning threshold, set uniformly for all branch
circuits (BC 1-42)
Percent breaker size, default = 70%
Alarm threshold, set uniformly for all branch
circuits (BC 1-42)
Percent breaker size, default = 80%
Warning time delay, set uniformly for all
branch circuits (BC 1-42)
Number seconds the warning threshold must be exceeded before a warning is
issued, default = 0
Alarm time delay, set uniformly for all branch
circuits (BC 1-42)
Number seconds the alarm threshold must be exceeded before a warning is
issued, default = 0
Individual Settings for Branch Circuits
Breaker size for individual branch circuits 1-42
BC warning/alarm thresholds are given as a percent of breaker size. Both
Normal
and
KWH
points lists allow breaker size to be specified individually for
each BC breaker (default = 20A).
The
Normal
points list allows customization of warnings and alarms for each branch circuit as shown in this section (grey
background).
Not available in the
Power-KHW
points list.
Warning thresholds (BC 1-42)
Percent breaker size, default = 70%
Alarm thresholds (BC 1-42)
Percent breaker size, default = 80%
Warning time delays (BC 1-42)
Number seconds the warning threshold must be exceeded before a warning is
issued, default = 0
Alarm time delays (BC 1-42)
Number seconds the alarm threshold must be exceeded before a warning is
issued, default = 0
Содержание PDI JCOMM
Страница 1: ...p n P 164001107 Revision 01 Installation and Operation Manual Eaton PDI JCOMM Enclosure...
Страница 4: ......
Страница 8: ...viii Eaton PDI JCOMM Enclosure Installation and Operation Manual P 164001107 Rev 01 List of Figures...
Страница 10: ...x Eaton PDI JCOMM Enclosure Installation and Operation Manual P 164001107 Rev 01 List of Tables...
Страница 12: ...2 Eaton PDI JCOMM Enclosure Installation and Operation Manual P 164001107 Rev 01 Safety...
Страница 44: ...34 Eaton PDI JCOMM Enclosure Installation and Operation Manual P 164001107 Rev 01 Operation...
Страница 46: ...36 Eaton PDI JCOMM Enclosure Installation and Operation Manual P 164001107 Rev 01 Service...
Страница 48: ...38 Eaton PDI JCOMM Enclosure Installation and Operation Manual P 164001107 Rev 01 Bibliography...
Страница 50: ...P 16400110701 P 164001107 01...