Eaton PDI JCOMM Enclosure Installation and Operation Manual P-164001107—Rev 01
a.
Connect
Voltage Source 2 ABCN
, from a panelboard circuit breaker or main feed to the Source 2
terminal blocks, ABCN.
b.
Connect
Voltage Source 2 G
to shared terminal block G.
Figure 5. JCOMM Power Panel
44..44
C
Coonnnneecctt M
Maaiinn oorr S
Suubbddiissttrriibbuuttiioonn C
CTTss
To measure current on main or subdistribution feeds, install split-core CTs rated at 250A on the wires (ABCNG)
and connect to matching cable harnesses.
Different combinations of circuit phases can be monitored: ABCNG, ABC, N only, or G only. Specify in software
setup which large circuit wires are monitored.
Power must be disconnected and locked out before installing and connecting CTs.
Parts used in this step (for each main or subdistribution feed):
Содержание PDI JCOMM
Страница 1: ...p n P 164001107 Revision 01 Installation and Operation Manual Eaton PDI JCOMM Enclosure...
Страница 4: ......
Страница 8: ...viii Eaton PDI JCOMM Enclosure Installation and Operation Manual P 164001107 Rev 01 List of Figures...
Страница 10: ...x Eaton PDI JCOMM Enclosure Installation and Operation Manual P 164001107 Rev 01 List of Tables...
Страница 12: ...2 Eaton PDI JCOMM Enclosure Installation and Operation Manual P 164001107 Rev 01 Safety...
Страница 44: ...34 Eaton PDI JCOMM Enclosure Installation and Operation Manual P 164001107 Rev 01 Operation...
Страница 46: ...36 Eaton PDI JCOMM Enclosure Installation and Operation Manual P 164001107 Rev 01 Service...
Страница 48: ...38 Eaton PDI JCOMM Enclosure Installation and Operation Manual P 164001107 Rev 01 Bibliography...
Страница 50: ...P 16400110701 P 164001107 01...