Powering down/up applications (examples)
Servicing the Network Management Module – 181
•
•
•
•
•
•
3. In the Pairing with shutdown agents section, select the time to accept new agents and press the Start button and the
press Continue. During the selected timeframe, new agent connections to the Network Module are automatically trusted and
accepted.
STEP 2: Action on the agent (IPP) while the time to accepts new agents is running on the Network Module
1. Connect to the web interface of the agent.
2. Detect the UPS Network Module with a Quick scan, Range scan or an Address(es) scan.
3. Right-click on the UPS Network Module when discovered and then Set as power source, Configure it, and Save it.
STEP 3: Action on the Network Module
1. Make sure all listed agents in the card (
Contextual help>>>Protection>>>Agents list
) belong to your infrastructure, if not,
access may be revoked using the Delete button.
2. If the time for pairing still runs, you can stop it. Press Stop in the Pairing with shutdown agents section.
4.2.3 Pairing with manual acceptance
Manual pairing provides the maximum security.
STEP 1: Action on the agent (IPP)
1. Connect to the web interface of the agent
2. Detect the UPS Network Module with a Quick scan, Range scan or an Address(es) scan.
3. Define the power source
Note: After that stage, the agent creates a client certificate. The power source could show a communication loss since the
current client certificate is not trusted by the Network Module.
4. Copy the agent certificate file client.pem that is located in the folder Eaton\IntelligentPowerProtector\configs\tls..
STEP 2: Action on the Network Module
1. Connect to the Network Module
On a network computer, launch a supported web browser. The browser window appears.
In the Address/Location field, enter: https://xxx.xxx.xxx.xxx where xxx.xxx.xxx.xxx is the static IP address of the Network
Module.
The log in screen appears.
Enter the user name in the User Name field.
Enter the password in the Password field.
Click Login. The Network Module web interface appears.
2. Navigate to
Contextual help>>>Settings>>>Certificate
page
3. In the Trusted remote certificates section, click Import, select Protected applications (MQTT) and then click on CONTINUE
4. Select the client.pem file previously saved, click Open. Communication with the agent is restored.
4.3 Powering down/up applications (examples)
4.3.1 Powering down IT system in a specific order
4.3.1.1 Target
Powering down applications first (when on battery for 30s), database servers next (3min after the applications), and storage last (as
late as possible).
STEP 1 and STEP2 can be done either ways.
Содержание Network-M3
Страница 1: ...UPS Network Management Card Network M3 User s Guide English 10 27 2023...
Страница 2: ......
Страница 10: ...Table of Contents 10 Applicable product Eaton UPS ATS...
Страница 32: ...Home Contextual help of the web interface 32 3 2 7 1 3 Battery mode 3 2 7 1 4 Off mode...
Страница 34: ...Home Contextual help of the web interface 34 3 2 7 2 3 Battery mode 3 2 7 2 4 Off mode...
Страница 36: ...Home Contextual help of the web interface 36 3 2 7 3 2 Bypass mode 3 2 7 3 3 Battery mode...
Страница 37: ...Home Contextual help of the web interface 37 3 2 7 3 4 HE mode ESS mode 3 2 7 3 5 Maintenance bypass mode...
Страница 63: ...Protection Contextual help of the web interface 63 Example 2 Immediate OFF...
Страница 64: ...Protection Contextual help of the web interface 64 Example 4 Custom Settings 1...
Страница 120: ...Settings Contextual help of the web interface 120 3 7 6 3 SSH 3 7 6 4 SNMP 3 7 6 5 MQTT...
Страница 287: ...Acronyms and abbreviations Information 287...
Страница 294: ......