
Eaton 93PM Integrated Battery Cabinet-Small Welded (IBC-SW) Installation Manual 164000639—Rev 03
25
Figure 8. Removing the Pallet Skids and Supports – Eaton 93PM Integrated Battery Cabinet
Rear Cabinet
Support
Cabinet
Support Bolts
(2 places at
each corner)
Left Side
Cabinet
Support
Pallet Skid
Right Side
Cabinet Support
Cabinet
Mounting Bolts
(4 places front)
(4 places rear)
Front Cabinet
Support
Skid Mounting Bolts
(4 places front)
(4 places rear)
Jacking Bolts
(2 places front)
(2 places rear)
Floor Protectors
(2 places front)
(2 places rear)
10. Remove the cabinet support bolts fastening the front, rear, and side cabinet supports together and remove
the side supports.
11. Remove the cabinet mounting bolts holding the front and rear supports to the cabinet base and remove
the supports.
12. If installing the cabinet permanently (requires the optional Floor Mount Bracket Kit), retain the cabinet
mounting bolts; otherwise, recycle the bolts along with the support brackets in a responsible manner.
13. If the leveling feet are not retracted, turn all four leveling feet until they are retracted as far into the cabinet
as possible.
NOTE
The battery cabinet may be located to either the right or left of the UPS cabinet. This
procedure assumes the battery cabinet is located to the right of the UPS cabinet.
14. If line-up-and-match installation, remove the rectangular and circular knockout on the bottom and top front
side of the UPS and the IBC–SW (see
15. The IBC–SW is shipped set up for rear ventilation with a cover plate installed over the ventilation grill on
top of the unit (see
). If top ventilation is required, remove the screws securing the plate at the
top of the unit and install the plate over the rear ventilation grill (see