Eaton 93PM Integrated Battery Cabinet-Small Welded (IBC-SW) Installation Manual 164000639—Rev 03
11..11
IInnssttaallllaattiioonn FFeeaattuurreess
•
Line-up-and-match configurations using factory supplied power wiring or standalone configurations using
customer supplied power wiring
•
Battery wiring can be run internally through the left or right sides of the IBC–SWs in line-up-and-match
configurations, or routed through the top or bottom of the IBC–SWs using conduit in standalone
configurations
•
Front access panel for access to the battery breaker
•
Interface wiring can be routed through the top left or right sides of the IBC–SWs in line-up-and-match
configurations or through the top or bottom of the IBC–SWs using conduit in standalone configurations
•
Built-in casters for easy cabinet placement
•
Cabinet bolt holes are provided for permanently mounting the IBC–SW using the optional Floor Mount
Bracket Kit
Line-up-and-match battery cabinets are installed adjacent to the UPS. The IBC-SW can be installed on either the
left or right side or on both sides of the UPS cabinet (see
Figure 2. Eaton 93PM UPS and Two 93PM IBC–SWs — Various Configurations
Left Side IBC-SW Installation
Right Side IBC-SW Installation
Combination IBC-SW Installation
IBC-SW2
IBC-SW1
UPS
UPS
IBC-SW1 IBC-SW2
IBC-SW1
UPS
IBC-SW2
11..22
O
Oppttiioonnaall TThheerrm
maall S
Seennssoorr
Thermal runaway protection for VRLA batteries can be provided by installing an optional thermal sensor inside
the battery cabinet.
The sensor is wired to an UPS building alarm programmed to turn the charger off when a trip signal is received.
The thermal sensor will maintain the trip state until the temperature it is reset by service. Service should be
called to inspect the batteries and reset the sensor in case of such an event.