Flexi -3G Installation & Commissioning Manual
Chapter 6. Installation of AC Cables
Document No: - 4493-CM-EN-10989402
Page 57 of 94
Copyright © 2008-2009 Eaton Corporation. All Rights Reserved
1Ø+N+PE 3Ø+N+PE
3 core cable of 25mm² minimum
or
25mm² minimum PVC (80
˚
C minimum)
singles in trunking or conduit.
5 core cable of 10mm² minimum
or
10mm² minimum PVC (80°C minimum)
singles in trucking or conduit.
Table 6-1 PBA-01 Cable Rating
6.4.3. AC Connection Information
Fig. 6-3 PBA-01 AC Rating Information Label
6.4.4. Installing Rectifiers in a PBA-01 System to Balance Phases
In order to provide a balanced load on the incoming AC supply, Install the quantity of rectifiers
required for the Power Supply Unit, with reference to the General Notes for Installing a Rectifier in
section 5.2. on page 49 and according to the table below.
Phase Connected
To
Rectifier Position in
Cabinet from Left to
Right
Installation Sequence
1
1
2
4
Ø1
3
7
4
2
5
5
Ø2
6
8
7
3
8
6
Ø3
9
9
Table 6-2 Installing Rectifiers in a PBA-01 Power Supply Unit