EFX48-xx Series with RM3-340/440 Installation and Operation Guide
74
Copyright © 2019 Eaton Corporation. All Rights Reserved.
IPN March 2019
Step 5 – Charge the batteries
1
Charge the batteries according to the battery manufacturer’s recommendations.
2
If an Equalisation charge is recommended by the battery manufacturer then
follow the instructions.
Equalisation increases the system voltage to the Equalise voltage for the
Equalise duration. After the Equalise duration has expired, the dc power
system voltage reverts to float voltage automatically.
Procedure complete
Start-Up Completed
Start-Up of the RM3-340/440 is now complete and the system is operational.
For information on alarms, or operation problems see Maintenance on page 119.
The following chapter describes how to use the EFX48 e-Fuse unit with embedded system
controller. Use this section in order to customize the system configuration settings and to setup
the remote communications options.
Содержание EFX48 e-Fuse Series
Страница 9: ......
Страница 50: ......
Страница 54: ......
Страница 88: ......
Страница 103: ...EFX48 e Fuse System Operation Copyright 2019 Eaton Corporation All Rights Reserved IPN March 2019 103...
Страница 156: ...Appendix D Menu Map Copyright 2019 Eaton Corporation All Rights Reserved IPN March 2019 156 Menu Map...
Страница 157: ...Menu Map Copyright 2019 Eaton Corporation All Rights Reserved IPN March 2019 157...