Installation
Copyright © 2019 Eaton Corporation. All Rights Reserved.
IPN March 2019
67
GPIO terminal #14
GPIO terminal #1
Step 2 - Terminate the cabling
•
Connect only voltage-free switch or relay contacts to Digital Inputs.
•
Do not exceed the voltage and current limits of the relay contacts.
•
For wire size and I/O ratings see Specifications on page 138.
1
Terminate the cable as in the diagram above.
2
Use cable ties to secure the cable and prevent strain on the connectors.
Step 3 - Set up EFX48
Configure the inputs and outputs after completing the installation and all the Startup
Tasks on page 69 Operation information on page 75.
Procedure complete
Task 9 - Connect to the AC Supply Point
Step 1 - RM3-340/440 systems with IEC cord sets
If the RM3-340/440 has permanently connected ac cords then go to Step 2.
Connect one of the cord sets provided to each IEC connector on the rear of the RM3-
340/440.
If the cord sets are missing or must be replaced then refer to Spare Parts on
page 154 for replacement items.
Содержание EFX48 e-Fuse Series
Страница 9: ......
Страница 50: ......
Страница 54: ......
Страница 88: ......
Страница 103: ...EFX48 e Fuse System Operation Copyright 2019 Eaton Corporation All Rights Reserved IPN March 2019 103...
Страница 156: ...Appendix D Menu Map Copyright 2019 Eaton Corporation All Rights Reserved IPN March 2019 156 Menu Map...
Страница 157: ...Menu Map Copyright 2019 Eaton Corporation All Rights Reserved IPN March 2019 157...