4 Operation
4.8 LED indicators
108
DS7 Soft starter
09/16 MN03901001Z-EN
www.eaton.com
Figure 76: Actuation signals and LEDs
a
Initialization
b
Ready for operation
c
Acceleration phase
d
Top of ramp reached (TOR signal)
→
The top of the ramp, TOR (i.e., after the t-Start time has
elapsed), and the actual motor acceleration can have different
durations. The actual acceleration time will depend on the load
and the motor, and even with the same identical t-Start setting
may result in different times if the loads change.
Error
RUN
U
s
t - Start
U
Start
t - Stop
TOR
(13/14)
U
T1, T2, T3
U
L1, L2, L3
EN
+ A1
a
b
c
d
Содержание DS7 Series
Страница 1: ...Manual DS7 Soft starter 09 16 MN03901001Z EN...
Страница 4: ...II...
Страница 14: ...0 About this Manual 0 8 Units of measurement 10 DS7 Soft starter 09 16 MN03901001Z EN www eaton com...
Страница 36: ...1 Device series DS7 1 14 Function 32 DS7 Soft starter 09 16 MN03901001Z EN www eaton com...
Страница 64: ...2 Engineering 2 15 Example of other load cycles 60 DS7 Soft starter 09 16 MN03901001Z EN www eaton com...
Страница 96: ...3 Installation 3 6 Insulation test 92 DS7 Soft starter 09 16 MN03901001Z EN www eaton com...
Страница 122: ...6 Parameterization 6 2 Default settings of the basic device 118 DS7 Soft starter 09 16 MN03901001Z EN www eaton com...
Страница 148: ...7 Connection examples 7 3 Size 3 and 4 41 200 A 144 DS7 Soft starter 09 16 MN03901001Z EN www eaton com...
Страница 188: ...8 SmartWire DT 8 9 Programming 184 DS7 Soft starter 09 16 MN03901001Z EN www eaton com...