Call points BG/pB Ex E VErsions

   TM244   May 2019   www.eaton.com

Call points BG/PB Ex e Versions

English

8.0 Functional safety – BG

Introduction

The BG Call Point has been designed for use in potentially 

explosive atmospheres and harsh environmental 

conditions . The glass reinforced polyester enclosures are 

suitable for use offshore or onshore, where light weight 

combined with corrosion resistance is required .

The function of the BG is to raise an alarm manually once 

verification of a fire or emergency condition exists, by 

breaking the Glass .

The BG Break glass Unit is configured with either a single 

series Resistor (R1) or an R1 and end of line resistor 

known as R2 . No Current passes through R1 in either 

configuration until the glass has been broken and the 

switch contacts have closed . Upon closure of the switch 

the current is then sent through R1 and hence changes the 

resistive value in the circuit which triggers the alarm . The 

R2 resistor always has a current flowing through which 

provides the reference resistive value for the circuit . The 

circuit can diagnose an open circuit failure in R1 without 

having to trigger the system via a continuity check which is 

a form of diagnostics for determining if an R1 resistor has 

failed Open Circuit . This form of diagnostics does however 

require a proof test to be conducted in order to identify 

the failure and depending on the set up of the system the 

defective Resistor may not be easily traceable if there are 

several BG break glass Units in the system . The end of line 

resistor R2 is used for the purpose of detecting an open or 

short circuit in the supply conductors .

The safety function of the Call Point is to raise the alarm 

when the Glass is Broken .

Under No fault (Normal) Operating conditions the BG 

Break Glass Unit will raise the alarm upon operating the 

switch via breaking the glass .

Under fault conditions the failure mode of the Break 

Glass is a failure to raise the alarm . For the failure rate 

associated with this failure mode please refer to the 

following table .

Assessment of functional safety

The BG Call Point is intended for use in a safety system 

conforming to the requirements of IEC61508 . Sira Test & 

certification Ltd has conducted a Failure Modes Effect and 

Diagnostic Analysis (FMEDA) of the BG Break Glass unit 

against the requirements of IEC61508-2 using a proof test 

interval of 8760hrs . The Call Point is classed as a 

Type A device .

BG breakglass unit

Safety Function of BG Break Glass Unit: 

‘To raise the alarm upon breaking the glass’

Architectural 

constraints:

Type A

HFT=0

SFF= 97%

Proof Test Interval

=8760Hrs

MTTR = 8 Hrs

SIL3

Random hardware 

failures:

λ

DD

 = 0

λ

DU

 = 5.72E-07

λ

SD

 = 0

λ

SU

 = 2.04E-05

Probability of failure 

on demand:

PFD

AVG

=2.51E-03

(Low Demand Mode)

SIL2

Probability of 

Dangerous failure on

safety function:

PFH = 5.72E-07

(High Demand Mode)

SIL2

Hardware safety 

integrity compliance

[1]

Route 1

H

Systematic safety 

integrity compliance

Route 1

S

Systematic Capability

SC2

Overall SIL-capability 

achieved

SIL 2 (Low Demand)

SIL 2 (High Demand)

Содержание BG

Страница 1: ...Call points BG PB Ex e Versions Technical manual...

Страница 2: ...peration 2 Replacement of the glass 2 Testing the unit 2 PBE units operation 3 Testing the unit 3 4 0 MAINTENANCE 3 5 0 CERTIFICATION APPROVALS 4 6 0 ELECTRICAL RATINGS 4 7 0 SPECIAL CONDITIONS 4 8 0...

Страница 3: ...unit VIII Ensure that only the correct listed or certified cable glands are used and that the assembly is shrouded and correctly earthed IX Ensure that only the correct listed or certified stopping p...

Страница 4: ...held in place by the two off slotted screws Take out the glass and remove any broken fragments from the unit Place the new glass element into the unit and replace the cover ensuring the 2 off slotted...

Страница 5: ...ove 4 0 Maintenance During the working life of the unit it should require little or no maintenance GRP will resist attack by most acids alkalis and chemicals and is as resistant to concentrated acids...

Страница 6: ...p and category marking II 2 GD Where Signifies compliance with ATEX II Signifies suitability for use in surface industries 2 Signifies suitability for use in a zone 1 and Zone 2 area G Signifies suita...

Страница 7: ...defective Resistor may not be easily traceable if there are several BG break glass Units in the system The end of line resistor R2 is used for the purpose of detecting an open or short circuit in the...

Страница 8: ...eld failures of this product should be collected under a dependability management process e g IEC 60300 3 2 and reported to the manufacturer 4 The unit should be tested at regular intervals to identif...

Страница 9: ...000 0 0020 0 0040 0 0060 0 0080 0 0100 0 0120 0 0140 0 3 6 9 12 15 18 21 24 27 30 33 36 39 42 45 48 51 54 57 60 63 66 69 72 75 PFD avg Time years PB Proof Time Interval versus SIL contribution SIL 2 c...

Страница 10: ...cement du verre 10 Test de l appareil 10 Appareils PBE fonctionnement 11 Test de l appareil 11 4 0 ENTRETIEN 11 5 0 CERTIFICATIONS HOMOLOGATIONS 12 6 0 CARACT RISTIQUES LECTRIQUES 12 7 0 CONDITIONS SP...

Страница 11: ...x exigences sp cifiques de l application MEDC recommande d identifier correctement tous les c bles et mes Veuillez vous reporter au sch ma de c blage fourni avec l appareil VIII S assurer que seuls le...

Страница 12: ...iquette du verre en vinyle Remplacement du verre Pour remplacer le verre apr s l utilisation de l appareil retirer le petit couvercle ext rieur maintenu en place par les deux vis tire fond fendues Sor...

Страница 13: ...4 0 Entretien L appareil devrait n cessiter peu ou pas d entretien au cours de sa dur e de vie Le plastique renforc r siste la plupart des acides produits chimiques et alcalis ainsi qu aux acides et...

Страница 14: ...e ATEX II 2 GD O conformit ATEX II Convient pour une utilisation dans les industries de surface 2 Convient pour une utilisation dans une Zone 1 et 2 G Convient pour une utilisation en pr sence de gaz...

Страница 15: ...tance en bout de ligne R2 est utilis e dans le but de d tecter un circuit ouvert ou un court circuit dans les conducteurs d alimentation La fonction de s curit du d clencheur d alarme veille d clenche...

Страница 16: ...sur le terrain de ce produit doivent tre collect es dans le cadre d un processus de gestion de la fiabilit par ex IEC 60300 3 2 et transmises au fabricant 4 L appareil doit tre test intervalles r gul...

Страница 17: ...eur SFF Conditions d utilisation s curis e Les conditions suivantes s appliquent l installation au fonctionnement et l entretien de l quipement valu Le non respect de ces conditions peut compromettre...

Страница 18: ...18 Erneuerung der glasscheibe 18 Test des ger ts 18 PBE Ger te betrieb 19 Test des Ger ts 19 4 0 WARTUNG 19 5 0 ZERTIFIZIERUNGEN GENEHMIGUNGEN 20 6 0 ELEKTRISCHE WERTE 20 7 0 SONDERBEDINGUNGEN 20 8 0...

Страница 19: ...e f r die vorgesehene Verwendung gelten durchgef hrt werden MEDC empfiehlt alle Kabel und Pole korrekt zu kennzeichnen Bitte beachten Sie den mit dem Ger t gelieferten Schaltplan VIII Achten Sie darau...

Страница 20: ...durch Einschlagen der Glasscheibe bet tigt Das Vinyl Glasetikett sch tzt den Meldenden vor Glasscherben Erneuerung der glasscheibe Zur Erneuerung der Glasscheibe nach einem Einsatz des Melders nehmen...

Страница 21: ...lte w hrend seiner Nutzungsdauer nur wenig oder sogar keinerlei Wartung ben tigen GFK ist best ndig gegen ber den meisten S uren Alkalien und Chemikalien und ist ebenso best ndig gegen ber konzentrier...

Страница 22: ...erwendung in oberirdischen Industriezweigen kennzeichnet 2 die Eignung zur Verwendung in einem Zone 1 und Zone 2 Bereich kennzeichnet G die Eignung zur Verwendung in gashaltigen Umgebungen kennzeichne...

Страница 23: ...n BG Break Glass Schaltern besteht Der Abschlusswiderstand R2 wird eingesetzt um einen offenen Kreis oder einen Kurzschluss in den Zuleitungen aufzusp ren Die Sicherheitsfunktion des Feuermelders ist...

Страница 24: ...ieses Produktes m ssen unter einem Zuverl ssigkeitsmanagementprozess z B IEC 60300 3 2 gesammelt und dem Hersteller mitgeteilt werden 4 Das Ger t sollte im Einklang mit diesem Sicherheitshandbuch in r...

Страница 25: ...SIL 2 Starke Anforderung Beschr nkt auf SIL 2 aufgrund von SFF Wert 0 0000 0 0020 0 0040 0 0060 0 0080 0 0100 0 0120 0 0140 0 3 6 9 12 15 18 21 24 27 30 33 36 39 42 45 48 51 54 57 60 63 66 69 72 75 P...

Страница 26: ...gerais 25 Acesso aos terminais 25 Unidades BGE Opera o 26 Substitui o do vidro 26 Teste da unidade 26 Unidades PBE Opera o 27 Teste da unidade 27 4 0 MANUTEN O 27 5 0 CERTIFICA O APROVA ES 27 Unidades...

Страница 27: ...aplic veis outros requisitos nacionais e ou locais VII A termina o dos cabos deve estar em conformidade com as especifica es referentes aplica o em quest o A MEDC recomenda que todos os cabos e condu...

Страница 28: ...do pela pel cula de vinil no vidro Substitui o do vidro Para substituir o vidro ap s a opera o da unidade remova a pequena tampa externa mantida no lugar pelos dois parafusos com fenda Retire o vidro...

Страница 29: ...ter refor ado com fibra de vidro GRP resiste ao ataque da maioria dos cidos bases e produtos qu micos em geral sendo resistente a cidos e bases concentrados como a maior parte dos produtos met licos T...

Страница 30: ...ica adequa o para uso em ind strias de superf cie 2 Significa adequa o para uso em reas de Zona 1 e Zona 2 G Significa adequa o para uso na presen a de gases D Significa adequa o para uso na presen a...

Страница 31: ...f cil rastrear o resistor defeituoso se houver v rias unidades de quebra de vidro BG no sistema O resistor R2 de fim de linha usado com a finalidade de detectar um circuito aberto ou um curto circuito...

Страница 32: ...as deste produto no campo dever o ser coletadas com um processo de gerenciamento confi vel por exemplo norma IEC 60300 3 2 e comunicadas ao fabricante 4 A unidade dever ser testada a intervalos regula...

Страница 33: ...0060 0 0080 0 0100 0 0120 0 0140 0 3 6 9 12 15 18 21 24 27 30 33 36 39 42 45 48 51 54 57 60 63 66 69 72 75 PFD med Tempo anos PB Intervalo de tempo de prova contra contribui o SIL SIL 2 devido a rest...

Страница 34: ...ints BG PB Ex e Versions TM244 May 2019 www eaton com Call points BG PB Ex e Versions Contents 1 0 B 33 2 0 O 33 3 0 33 33 33 BGE 34 34 34 35 35 4 0 T 35 5 0 C 35 6 0 36 7 0 36 8 0 BGE 36 37 37 9 0 38...

Страница 35: ...2019 www eaton com Call points BG PB Ex e Versions 1 0 B 5 2 16 20 4 2 5 2 9 4 0 2 6 BGE 2 0 O I II III IV V VI IEE Wiring Regulations IEE National Electrical Code VII MEDC VIII IX NEMA IP X IP MEDC H...

Страница 36: ...l points BG PB Ex e Versions TM244 May 2019 www eaton com Call points BG PB Ex e Versions 4 5 4 0 A F 5 4 A F IP 2 5 3 0 BGE 4 5 6 1 2 3 120 2 92 1 16 1 16 1 67 2 25 1 75 2 126 2 72 1 6 0 4 BGE 60 MED...

Страница 37: ...sions TM244 May 2019 www eaton com Call points BG PB Ex e Versions PBE 16 16 120 2 92 1 4 5 6 1 2 3 25 1 116 3 67 2 126 2 72 1 6 0 4 1 2 90 4 0 T MEDC MEDC Ref 10 99900225 20 99902200 30 MEDC 40 4 999...

Страница 38: ...b mb IIC T4 Gb 35 C 70 C Ex tb IIIC T135 C Db IP66 IP67 35 C 70 C IECEx Gb Db Gb 1 Db 1 ATEX EN60079 0 EN60079 1 EN60079 7 EN60079 18 EN60079 31 Ex de ATEX BAS02ATEX2105X Ex db eb IIC T6 Gb 40 C 70 C...

Страница 39: ...G PB Ex e Versions 3 IP66 4 1500 8 0 BGE BG BG BG R1 R1 R2 R1 R1 R2 R1 R1 BG R2 BG BG 61508 Sira Test certification Ltd FMEDA BG 61508 2 8760 BG BG m HFT 0 SFF 97 8760 MTTR 8 SIL3 DD 0 DU 5 72 07 SD 0...

Страница 40: ...38 Call points BG PB Ex e Versions TM244 May 2019 www eaton com Call points BG PB Ex e Versions 1 1 2 3 60300 3 2 4...

Страница 41: ...May 2019 www eaton com Call points BG PB Ex e Versions 9 0 IEC61508 UL FMEDA IEC 61508 2 8760 1 PB HFT 0 SFF 79 7 8760 MTTR 8 SIL2 DD 0 DU 3 43E 08 SD 0 SU 1 34E 07 PFDAVG 1 50E 04 SIL3 PFH 3 43E 08 S...

Страница 42: ...ns TM244 May 2019 www eaton com Call points BG PB Ex e Versions 0 0000 0 0020 0 0040 0 0060 0 0080 0 0100 0 0120 0 0140 0 3 6 9 12 15 18 21 24 27 30 33 36 39 42 45 48 51 54 57 60 63 66 69 72 75 PFD PB...

Страница 43: ...41 Call points BG PB Ex e Versions TM244 May 2019 www eaton com Call points BG PB Ex e Versions...

Страница 44: ...ntained in this document and to prices are reserved so are errors and omissions Only order confirmations and technical documentation by Eaton is binding Photos and pictures also do not warrant a speci...

Отзывы: