Eaton 93PM-L 20–200kW (208V) UPS Installation and Operation Manual 164000724—Rev 01
21
Figure 7. Remote EPO Switch Dimensions
115.8
[4.56]
114.3
[4.50]
0.87
[0.22]
88.9
[3.50]
1.57
[0.40]
95.3
[3.57]
1/2” Knockout Pattern
(Typical 5 sides)
Needed to
remove key
Dimensions are in millimeters (inches)
33..22..22
U
UP
PS
S S
Syysstteem
m P
Poow
weerr W
Wiirriinngg P
Prreeppaarraattiioonn
Read and understand the following notes while planning and performing the installation:
WARNING
As a result of the connected loads high leakage current is possible. Connection to earth ground is required for
safety and proper product operation. Do not check UPS operation by any action that includes removal of the
earth (ground) connection with loads attached.
•
Refer to national and local electrical codes for acceptable external wiring practices.
•
To allow for future power upgrades, Eaton recommends installing the UPS using wiring and external
overcurrent protection breakers sized for the fully rated UPS kW frame size installed instead of the derated
kW ordered. Wiring for the maximum kW frame size will allow a full power rating upgrade without having
to modify the site wiring infrastructure.
•
For external wiring, use 75°C copper wire. Wire sizes listed in
through
are for copper
wiring only. If wire is run in an ambient temperature greater than 40°C, larger size wire may be necessary.
Wire sizes are based on using the specified breakers.
•
The AC output and output ground wiring to the critical load should be sized the same as the UPS rectifier,
bypass, and rectifier and bypass ground wiring if the recommended output breaker listed in
is not
installed in the system.
•
Recommended wire sizes are based on NFPA National Electrical Code
®
(NEC
®
)70 Table 310.15(B)(16) 75°
C ampacity with 40°C ambient correction factors.
•
The neutral conductor is sized the same as the phase conductor for balanced and resistive loads. Non-
linear loads, up to the maximum of 1.5x the load current, require a larger neutral conductor and should be
sized in accordance with NFPA NEC 70 Article 310.15(B)(5).
Содержание 93PM-L IAC-B
Страница 1: ...p n 164000724 Revision 01 20 200 kW 208V UPS Installation and Operation Manual Eaton 93PM L UPS ...
Страница 10: ...x Eaton 93PM L 20 200kW 208V UPS Installation and Operation Manual 164000724 Rev 01 List of Tables ...
Страница 112: ...102 Eaton 93PM L 20 200kW 208V UPS Installation and Operation Manual 164000724 Rev 01 UPS System Installation ...
Страница 148: ...138 Eaton 93PM L 20 200kW 208V UPS Installation and Operation Manual 164000724 Rev 01 Communication ...
Страница 154: ...144 Eaton 93PM L 20 200kW 208V UPS Installation and Operation Manual 164000724 Rev 01 UPS Maintenance ...
Страница 158: ...148 Eaton 93PM L 20 200kW 208V UPS Installation and Operation Manual 164000724 Rev 01 Product Specifications ...
Страница 161: ...Eaton 93PM L 20 200kW 208V UPS Installation and Operation Manual 164000724 Rev 01 151 Warranty ...
Страница 162: ...16400072401 164000724 01 ...