Eaton 93PM Universal Integrated Battery Cabinet (IBC-LW and IBC-LHW) Installation Manual P-164000541—Rev 04
51
Table 13. Eaton 93PM IBC-LW or Eaton 93PM IBC-LHW – TB2 Interface Wiring Terminal Block Terminations
Terminal Function
Size of Pressure
Termination
Tightening
Torque Nm (lb
in)
Type
Screw
Comments
Shunt Trip
#26–#16
0.4 (3.5) - 0.8 (7.1)
Slotted
Use twisted-pair wires for each input and
return or common. Strip wire insulation back
10 millimeters to wire terminal blocks.
Use wire rated for 600V and Class 1 wiring
methods.
Battery Detect
#26–#16
0.4 (3.5) - 0.8 (7.1)
Slotted
Use twisted-pair wires for each input and
return or common. Strip wire insulation back
10 millimeters to wire terminal blocks.
Thermal Sensor
#26–#16
0.4 (3.5) - 0.8 (7.1)
Slotted
Use twisted-pair wires for each input and
return or common. Strip wire insulation back
10 millimeters to wire terminal blocks.
Figure 25. Interface Terminal Detail – Eaton 93PM IBC-LW or Eaton 93PM IBC-LHW
Thermal Sensor (Optional)
Thermal Sensor Return (Optional)
Not Used
To Next IBC TB2-2 (Battery Shunt Trip -)
To Next IBC TB2-1 (Battery Shunt Trip +)
Battery Detect
To Next IBC TB2-4 (Battery Detect Common)
Not Used
Battery Shunt Trip – (UPS)
Battery Shunt Trip + (UPS)
IBC
TB2
10
1
NOTE 1
TB2 is located at tthe top of the IBC.
NOTE 2
TB2 connector pin 1 located at the bottom of the terminal block.
NOTE 3
The Thermal Sensor is optional.