
7.
Route and connect power wiring. Use movable cable support beams if
needed. See
Figure 15: Cable support beams
8.
When all wiring is complete, close the right panel and tighten the screws.
9.
If installing a parallel system, repeat the above steps to all units in the
system.
Figure 13: Removing the right panel
Figure 14: Gland plate locations
1. Top exhaust fan panel
(optional)
© Eaton Corporation plc 2020. All rights reserved.
Revision: 001
Document ID: P-164000956
58 (141)
Eaton 93PM G2 UPS 50 – 360 kVA
User’s and Installation Guide