Installation Plan and Unpacking
3-20 Eaton 93PM Sidecar Integrated Accessory Cabinet-Bypass (150 kW and 200 kW SIAC-B) Installation and Operation Manual P-164000387—Rev
7
www.eaton.com/powerquality
The power wiring terminals E1 through E3 for the 93PM 200 kW Three-Wire SIAC-B are pressure terminations.
Power wiring terminals E6 through E11 for the 93PM 200 kW Three-Wire SIAC-B are 2-hole bus bar mountings
for standard NEMA 2-hole barrel lugs. The power wiring connections for this equipment are UL and CSA rated.
See Table 3-8 for external power cable terminations, Table 3-10 for supplied external wiring terminal hardware,
and Table 3-11 for recommended installation parts and tools not supplied by Eaton.
Figure 4-19 or Figure 4-20 shows the location of the SIAC-B power cable terminals.
The power wiring terminals E1 through E3 for the 93PM 200 kW Four-Wire SIAC-B are pressure terminations.
Power wiring terminals E6 through E11 for the 93PM 200 kW Four-Wire SIAC-B are 2-hole bus bar mountings
for standard NEMA 2-hole barrel lugs. The power wiring connections for this equipment are UL and CSA rated.
See Table 3-9 for external power cable terminations, Table 3-10 for supplied external wiring terminal hardware,
and Table 3-11 for recommended installation parts and tools not supplied by Eaton.
Figure 4-19 or Figure 4-20 shows the location of the SIAC-B power cable terminals.
Table 3-8. External Input Power Cable Terminations for the Eaton 93PM 200 kW Three-Wire SIAC-B
Terminal Function
Terminal
Function
Number and Size of Pressure
Termination
(
AWG or kcmil)
Tightening Torque
Nm (lb ft)
Size Screw and Type
AC Input to RIB – Source 1
(4-breaker version only
)
E1 (RIB–1)
Phase A
2 – 3/0–250
42 (31)
5/16" Hex
E2 (RIB–3)
Phase B
2 – 3/0–250
42 (31)
5/16" Hex
E3 (RIB–5)
Phase C
2 – 3/0–250
42 (31)
5/16" Hex
AC Input to Maintenance Bypass – Source 2
E6
Phase A
2 – 2 bolt mounting
35 (26)
M12 Hex Bolt
E7
Phase B
2 – 2 bolt mounting
35 (26)
M12 Hex Bolt
E8
Phase C
2 – 2 bolt mounting
35 (26)
M12 Hex Bolt
AC Output to Critical Load
E9
Phase A
2 – 2 bolt mounting
35 (26)
M12 Hex Bolt
E10
Phase B
2 – 2 bolt mounting
35 (26)
M12 Hex Bolt
E11
Phase C
2 – 2 bolt mounting
35 (26)
M12 Hex Bolt
Building, Inter-Cabinet, and Load Ground
TBG
Ground
4 – #14–1/0
5.1 Nm (45 lb in)
Slotted
Table 3-9. External Input Power Cable Terminations for the Eaton 93PM 200 kW Four-Wire SIAC-B
Terminal Function
Terminal
Function
Number and Size of Pressure
Termination
(
AWG or kcmil)
Tightening Torque
Nm (lb ft)
Size Screw and Type
AC Input to RIB – Source 1
(4-breaker version only
)
E1 (RIB–1)
Phase A
2 – 3/0–250
42 (31)
5/16" Hex
E2 (RIB–3)
Phase B
2 – 3/0–250
42 (31)
5/16" Hex
E3 (RIB–5)
Phase C
2 – 3/0–250
42 (31)
5/16" Hex
AC Input to Maintenance Bypass – Source 2
E6
Phase A
2 – 2 bolt mounting
35 (26)
M12 Hex Bolt
E7
Phase B
2 – 2 bolt mounting
35 (26)
M12 Hex Bolt
E8
Phase C
2 – 2 bolt mounting
35 (26)
M12 Hex Bolt
E12
Neutral
4 – 2 bolt mounting
35 (26)
M12 Hex Bolt
AC Output to Critical Load
E9
Phase A
2 – 2 bolt mounting
35 (26)
M12 Hex Bolt
E10
Phase B
2 – 2 bolt mounting
35 (26)
M12 Hex Bolt
E11
Phase C
2 – 2 bolt mounting
35 (26)
M12 Hex Bolt
E12
Neutral
4– 2 bolt mounting
35 (26)
M12 Hex Bolt
Building, Inter-Cabinet, and Load Ground
TBG
Ground
4 – #14–1/0
5.1 Nm (45 lb in)
Slotted
Содержание 93PM 150 kW SIAC-B Three-Wire
Страница 2: ......
Страница 19: ...Section 1 Installation ...
Страница 20: ......
Страница 75: ...Section 2 Operation ...
Страница 76: ......
Страница 105: ......
Страница 106: ... P 164000387 7 P 164000387 7 ...