
INSTALLATION
Eaton
®
9130 UPS (700–3000 VA) User's Guide
S
164201718 Rev 3
www.eaton.com/powerquality
20
Rackmount Setup
C
A
U
T
I
O
N
S
The cabinet is heavy (see page 78). Removing the cabinet from its carton requires a
minimum of two people.
S
If installing optional EBM(s), install the EBM(s) directly below the UPS so that all wiring
between the cabinets is installed behind the front covers and is inaccessible to users.
NOTE
Mounting rails are required for each individual cabinet.
To install the rail kit:
1.
Assemble the left and right rails to the rear rails as shown in
Figure 4. Do not tighten the screws.
Adjust each rail size for the depth of your rack.
Rear Rails
Right Rail
Left Rail
M4
8 Pan-Head
Screws (6 places)
Figure 4. Assembling the Rails
Содержание 9130 UPS
Страница 1: ...Powerware Series Eaton 9130 UPS 700 3000 VA User s Guide...
Страница 44: ...INSTALLATION Eaton 9130 UPS 700 3000 VA User s Guide S 164201718 Rev 3 www eaton com powerquality 36...
Страница 82: ...UPS MAINTENANCE Eaton 9130 UPS 700 3000 VA User s Guide S 164201718 Rev 3 www eaton com powerquality 74...
Страница 108: ...SPECIFICATIONS Eaton 9130 UPS 700 3000 VA User s Guide S 164201718 Rev 3 www eaton com powerquality 100...
Страница 114: ...TROUBLESHOOTING Eaton 9130 UPS 700 3000 VA User s Guide S 164201718 Rev 3 www eaton com powerquality 106...