background image

Eastron SDM230-Modbus User Manual 

 

Jiaxing Eastron Electronic Instruments Co.,Ltd.            Tel: 0086-573-83698881 / 83698882        Fax: 0086-573-83698883 
Add:No.1369, Chengnan Road, Jiaxing, Zhejiang, 314001, China.    Web: www.eastron.com.cn        Email: [email protected] 
 

- 1 -

 

 

SDM230-Modbus 

Single-Phase Two Module DIN rail Meters 

 

 

 

Measures kWh, Kvarh, KW, Kvar, KVA, PF, Hz, dmd, V, A, etc.   

 

Bi-directional measurement IMP & EXP 

 

Two pulse outputs 

 

RS485 Modbus 

 

Din rail mounting 35mm 

 

100A direct connection 

 

Better than Class 1 / B accuracy   

 

User Manual V1.4 

2015 

Содержание SDM230-Modbus

Страница 1: ...Road Jiaxing Zhejiang 314001 China Web www eastron com cn Email sales eastrongroup com 1 SDM230 Modbus Single Phase Two Module DIN rail Meters Measures kWh Kvarh KW Kvar KVA PF Hz dmd V A etc Bi directional measurement IMP EXP Two pulse outputs RS485 Modbus Din rail mounting 35mm 100A direct connection Better than Class 1 B accuracy User Manual V1 4 2015 ...

Страница 2: ...e for solar PV energy metering PART 1 Specification General Specifications Voltage AC Un 230V Voltage Range 176 276V AC Base Current Ib 10A Max Current Imax 100A Mini Current Imin 0 5A Starting current 0 4 of Ib Power consumption 2W 10VA Frequency 50 60Hz 10 AC voltage withstand 4KV for 1 minute Impulse voltage withstand 6KV 1 2uS wavform Overcurrent withstand 30Imax for 0 01s Pulse output rate 10...

Страница 3: ...th pulse outputs are passive type Pulse output 1 is configurable The pulse output can be set to generate pulses to represent total import export kWh or kVarh The pulse constant can be set to generate 1 pulse per 0 001 default 0 01 0 1 1kWh kVarh Pulse width 200 100 60ms Pulse output 2 is non configurable It is fixed up with import kWh The constant is 1000imp kWh RS485 output for Modbus RTU The met...

Страница 4: ...Display When it is powered on the meter will initialize and do self checking Full screen software version Modbus ID Baud rate total kWh Scroll display by Button After initialization and self checking program the meter display the measured values The default page is total kWh If the user wants to check other information he needs to press the scroll button on the front panel The display order by scr...

Страница 5: ...jiang 314001 China Web www eastron com cn Email sales eastrongroup com 5 Page Display Descriptions 1 Total active energy Example 70 00kWh 2 Import active energy Example 50 00kWh 3 Export active energy Example 20 00kWh 4 Total resettable energy 5 Total reactive energy Example 10 00kVarh 6 Import reactive energy Example 5 00kVarh 7 Export reactive energy Example 5 00kVarh ...

Страница 6: ...883 Add No 1369 Chengnan Road Jiaxing Zhejiang 314001 China Web www eastron com cn Email sales eastrongroup com 6 8 Total resettable reactive energy 9 Total max demand Example 6930W 10 Voltage Example 229 8V 11 Current Example 30 156A 12 Active Power Example 4700W 13 Reactive Power Example 1030Var 14 Apparent power Example 4811VA ...

Страница 7: ...Fax 0086 573 83698883 Add No 1369 Chengnan Road Jiaxing Zhejiang 314001 China Web www eastron com cn Email sales eastrongroup com 7 15 Power factor Example 1 000 16 Frequency Example 49 99Hz 17 Pulse Constant Example 1000 18 Modbus Address Example 001 19 Baud rate Example 9600 20 Continuous running time In total ...

Страница 8: ...ton for 3 second Page Display Descriptions The setting is done correctly The entering information is wrong The operation fails 1 Password To get into Set up mode it asks a password confirmation Default password 1000 2 Address ID Default ID is 001 Range 001 247 2 1 Press the Enter button the first digit flash Press the Scroll button to change the value After choose the new address value the user ne...

Страница 9: ... button the red part flash Press the Scroll button to change the option After choose the new Parity the user need pressing the Enter button to confirm the setting 5 Pulse Output Default Export kWh Option kWh KVarh Imp Kwh Exp kWh Imp kVarh Exp kVarh 5 1 Press the Enter button the red part flash Press the Scroll button to change the option After choose the new Pulse output option the user need pres...

Страница 10: ...he Enter button to confirm the setting 8 Demand Integration Time Default 15 minutes Option 0 5 10 15 30 60 8 1 Press the Enter button the red part flash Press the Scroll button to change the option After choose the new DIT option the user need pressing the Enter button to confirm the setting 9 Automatic Scroll Time Interval Default 0 S Option 0 30S 9 1 Press the Enter button the red part flash Pre...

Страница 11: ... new Scrl option the user need pressing the Enter button to confirm the setting 11 Clear Long press Enter to enter clear interface 11 1 Clear Max demand of active power Long press Enter button to confirm the operation 11 2 Clear the resettable energy Long press the Enter button to confirm the operation 10 Password Default 1000 10 1 Press the Enter button the red part flash Press the Scroll button ...

Страница 12: ...Jiaxing Eastron Electronic Instruments Co Ltd Tel 0086 573 83698881 83698882 Fax 0086 573 83698883 Add No 1369 Chengnan Road Jiaxing Zhejiang 314001 China Web www eastron com cn Email sales eastrongroup com 12 Wiring diagram Dimensions ...

Страница 13: ...Manual Jiaxing Eastron Electronic Instruments Co Ltd Tel 0086 573 83698881 83698882 Fax 0086 573 83698883 Add No 1369 Chengnan Road Jiaxing Zhejiang 314001 China Web www eastron com cn Email sales eastrongroup com 13 Installation ...

Отзывы: