Installation and Set Up 13
Power Cord
The Eastey L-Sealer and Heat Tunnel combo can be used in a variety of locations. To
allow the option of hard wiring the power cord into an existing electrical panel, the
combo unit is shipped without a three-pronged plug attached to the power cord. If the
combo unit is going to be used with a typical three-pronged outlet attach a certified and
approved three-pronged plug to the power cord.
Attention!
Ensure that any wiring complies with all electrical wiring
codes and specifications that apply to the installation
location.
Location Requirements
There are four casters located on the bottom of the L-sealer and heat tunnel combo unit
to help in moving the machine. When the combo unit is in the operating location adjust
the four leveling pads for correct height.
When installing the combo unit please be aware of the following considerations:
1. The mounting surface is flat and level.
2. Alignment with any existing packaging lines or conveyors.
The machine should be placed on a flat, level floor so that it does not rock or move. We
recommend that the machine be securely locked in place when used.
When the Eastey L-Sealer and Heat Tunnel Combo unit is positioned in the operating
location, you will need access to:
1. Both control panels: control panel for the sealer and control panel for the tunnel.
2. Seal head handle.
3. Sealer table height adjustment wheel.
4. Sealer table horizontal red locking lever.
5. Shrink film roller.
6. Pin perforation wheels.
These locations are generally accessible from the operator side of the machine. The
film and pinwheel rollers are located under the product tray.