![Eastey BB-2T Скачать руководство пользователя страница 15](http://html1.mh-extra.com/html/eastey/bb-2t/bb-2t_user-manual_3469629015.webp)
Operation 15
Operation
Load Tape
Press the Stop switch and disconnect the power.
CAUTION!
To avoid personal injury, remove the tape cartridge before
loading tape.
When handling the tape cartridge be careful to avoid contact
with the tape cutting blade.
The taping cartridge in the upper head assembly is secured in place by a single wing
bolt (winged-head cap screw). Temporarily remove the wing bolt to remove the upper
tape head.
After the tape head has been removed, remove core of spent tape roll (if present) and
push the tape roll onto the spindle assembly.
NOTE: Make sure the tape roll is pushed all the way on the spindle
assembly.
Tape Roll
Tape Core
Spindle
Содержание BB-2T
Страница 1: ...BB 2 3T Bottom Belt Case Taping System User Guide...
Страница 2: ......
Страница 4: ......
Страница 6: ......
Страница 10: ...10 Introduction Dimensions Dimensions shown are in inches...
Страница 30: ...30 Illustrated Parts List Parts List Electrical 2 1 1a...
Страница 37: ...Appendix A Electrical Schematic 37 Appendix A Electrical Schematic...
Страница 41: ......
Страница 42: ......