SCOPE 

 
This manual contains information concerning the installation, operation and 
maintenance of the Vantage 4000. To ensure proper performance of the unit, the 
instructions should be thoroughly understood and followed.  
 

Keep the manual in a  readily accessible location for future reference. 

 
Changes and additions to the original edition of this manual will be covered by a “CHANGE 
NOTICE” supplied with the manual. The change notice will identify the sections in this manual 
where the changes have occurred. 
 
 
 

Vantage 4000 

Table of Contents 

 
Scope............................................................................................................................   1-1 
General Specifications ...................................................................................................   1-2 
 

Installation Procedure

.................................................................................................   2-1 

Enclosure Mounting.......................................................................................................   2-1 
System Diagram............................................................................................................   2-2 
Wiring Connections .......................................................................................................   2-3 
Splice Procedure............................................................................................................   2-5 
 

Programming

...............................................................................................................   3-1 

QuikCal Menu Functions ...............................................................................................   3-1 
 

Main Flow Screen

.....................................................................................................   3-2 

 

Review Meter

............................................................................................................   3-2 

 

Program

....................................................................................................................   3-2 

    Measure Units .........................................................................................................   3-2 
    Sensor Install...........................................................................................................   3-3 
    Totalizer .................................................................................................................   3-5 
    4-20 Output .............................................................................................................   3-6 
    Damping.................................................................................................................   3-6 
    Lost Signal..............................................................................................................   3-7 
    Flow Simulation ......................................................................................................   3-7 
    Integrator ................................................................................................................   3-7 
    Setpoints .................................................................................................................   3-8 
    Relays.....................................................................................................................   3-8 

  Daily Sum

.................................................................................................................   3-8 

  Data Logger

..............................................................................................................   3-9 

  System Setup

.............................................................................................................   3-9 

 
 
 

Section 

1-1 

942000 

12/02

 

Содержание Vantage 4000

Страница 1: ...h the manual The change notice will identify the sections in this manual where the changes have occurred Vantage 4000 Table of Contents Scope 1 1 General Specifications 1 2 Installation Procedure 2 1...

Страница 2: ...ata Logger Software CD Display Backlit LCD 128x64 Graphic Module Programming Front panel mounted 16 button keypad Computer or Palm Pilot Power 80 240 VAC 50 60 Hz or 12 28 VDC 350 mA continuous Accura...

Страница 3: ...hinged door clasps on the front cover of the enclosure To open put thumb on one of the hinges pull toward the outside of the enclosure Once the hinge pops to the outside it will lower allowing the cl...

Страница 4: ...Pull Box by others Flex Conduit by others Sensor Cable 1000ft max NEMA 4X IP66 Enclosure Sensor connections 1 2 14 NPT 7 8 entrance holes 3 places 2 2 Note The key will have to be left in the hinge ha...

Страница 5: ...C power terminal is separate from the other two terminal strips The power terminal strip has three connections for High Low and Ground for AC voltage only Refer to the wiring diagram below for all int...

Страница 6: ...cable and remove the middle cover 4 Remove middle shield Measure 5 8 from the end of the cable With a pair of small cutters cut the shield around the cable at the measured point and remove the cut of...

Страница 7: ...inches outside of junction box Select one sensor cable and one cable from the electronic enclosure and place them side by side as shown in Fig 1 Twist each cable s outer pigtails together then the inn...

Страница 8: ...g To adjust damping time 06 Lost Signal To adjust Lost signal time and Fail to zero or span 07 Flow Sim Flow simulation 08 Integrator To assign closure for contact integrator 09 Setpoints To assign se...

Страница 9: ...s ENTER key and number 01 Flow Units Select the flow engineering unit desired by pressing the number in front of the selection Units available are 01 GPM gallons minute 09 LPD liters day 02 GPD gallon...

Страница 10: ...sensor and is 640KHZ operating frequency 06 V30ST 640 is the small new style strap on sensor for high temperature applications and is 640KHZ operating frequency 07 V30L 640 is the large new style stra...

Страница 11: ...pe Material screen Pipe Material The pipe material screen will allow you to select the pipe material for the unit Selections are Carbon Steel Stainless Steel PVC Cast Iron Ductile Iron Asbestos Cement...

Страница 12: ...sensor placement on the pipe Selections are 01 Z Shot sensors are mounted on opposite sides of pipe 02 V Shot sensors are mounted on the same side of pipe 03 W Shot sensors are mounted on the same sid...

Страница 13: ...ards To adjust Span Press the 6 key the cursor arrow will appear before the 6 20 mA line Press the 3 key for coarse adjustment or the 4 key for fine adjustment Now press the 1 key to adjust the mA upw...

Страница 14: ...key the next screen to appear is the Lost Signal Action assignment In this screen the user will select the default for the 4 20mADC output during a lost signal condition The selections are 01 Fail to...

Страница 15: ...t after the selection is entered Press the ENTER key The Setpoints must be assigned to a Relay 10 Relays Relay Assignment The next option in the program menu is the Relays screen To select this press...

Страница 16: ...1 Not active 02 Setpoint 1 03 Setpoint 2 04 Setpoint 3 If set points are selected then the next screen will be storage rate times available 04 Log Channels There are up to 8 channels available for log...

Страница 17: ...Display Mode 4 N A Model 4400 01 Display Mode 1 Flow Velocity Totalizer and Status 02 Display Mode 2 N A 03 Display Mode 3 N A 04 Display Mode 4 N A 05 Options N A 06 Totals Reset This option will re...

Страница 18: ...s or omissions of others after shipment nor any consequential incidental or contingent damage whatsoever A claim for equipment damaged in transit is the sole responsibility of the customer NUCLEAR DIS...

Отзывы: