Fig.5-15 The board of 20kVA model (Rack)
5.4 Board replacement of 30kVA model
The 30kVA model includes the following boards: power board, IP/OP board, Inductor board, bypass board,
monitoring board, cold start board, parallel interface board, communication interface board, dry contact board; the
specific locations are shown in Fig.5-16 to 5-20.
Fig.5-16 The right side board of 30kVA long-delay model (Tower)