Flooded System/2V

Installation and Operation Manual

Содержание Deka SOLAR Flooded System/2V

Страница 1: ...Flooded System 2V Installation and Operation Manual...

Страница 2: ...oD 3 Charging 3 Maintenance 3 Battery Installation Receiving a Battery 3 Lifting Batteries 4 Installing Batteries 4 Charging Safety 4 Connecting Disconnecting Charger 4 Battery Operation Discharge Vol...

Страница 3: ...relevant to your specific application IEEE 450 Recommended Practice for Maintenance Testing of Vented Lead Acid Batteries for Stationary Applications IEEE 937 Recommended Practice for Installation Ma...

Страница 4: ...ery racking system must be of sufficient strength and anchoring Battery rack design should be reviewed by structural engineer Ventilation It is the responsibility of the installer to provide detailed...

Страница 5: ...This increase corrosion of the positive plates contributes greatly to reducing the overall life of the battery Depth of Discharge DoD Depth of discharge is a function of design The deeper the dischar...

Страница 6: ...uce voltage drop Use a voltmeter to confirm correct polarity Lug bolt hole should be 5 16 in dia Hardware supplied with battery should be used All battery connections should be torque to 150 in lb All...

Страница 7: ...30 vpc to 2 35 vpc Equalize 2 50 vpc to 2 55 vpc Ahr Amp Hours removed during discharge Ic Maximum current available to battery from charger C20 C20 rate in Ah East Penn Mfg recommends returning 120...

Страница 8: ...tative 4 Remember to accurately record the number of cycles specific gravity temperature and voltage readings and all maintenance and repair information for every battery Maintenance Report Appendix A...

Страница 9: ...the final voltage was reached you can determine whether the battery is delivering its rated capacity 1 Give the battery an equalizing charge and adjust the specific gravity to the manufacturer s spec...

Страница 10: ...ean battery 2 Battery used beyond its useful life 2 Replace battery with equal or higher capacity battery 3 Weak leaking or defective cell s 3 Replace problem cell s in battery Unequal Cell voltages 1...

Страница 11: ...age Electrolyte Specific Temperature Gravity Battery Maintenance Report Site Location ______________________________________ Installation Date _____________________________________ Pilot Cell ________...

Страница 12: ...lectrolyte Specific Temperature Gravity Battery Maintenance Report Site Location ______________________________________ Installation Date _____________________________________ Pilot Cell _____________...

Страница 13: ...11 aPPEndix B...

Страница 14: ...oxide PbO2 positive or Lead Pb negative plate Charging Rate The current expressed in amperes at which the battery is charged Circuit A system of electrical compo nents through which an electric curren...

Страница 15: ...when the two terminals of a cell or battery are inadvertently connected to each other Standing Loss The loss of charge by an idle cell or battery resulting from local action State of Charge SOC The am...

Страница 16: ...or reproduced electronically or mechanically without written permission from the company Domestic Inquiries Call 1 800 372 9253 www mkbattery com e mail sales mkbattery com East Penn Manufacturing Co...