background image

UK Single Phase 

Equalizer Guide

Quick guide

Содержание E02-EQP

Страница 1: ...UK Single Phase Equalizer Guide Quick guide...

Страница 2: ...nd guaranteed to work with the Easee Equalizer E02 EQP Not for use with the Easee Equalizer HAN version Energy Meter Eastron SDM120CT RJ12 Current Transformer ESCT TU16 RJ12 100A 3m length Cable RJ12...

Страница 3: ...cian All applicable local regional and national regulations for electrical installations must be adhered to Please check the safety instructions on the manufacturer s user guides for all the component...

Страница 4: ...WARNING Turn off the power before you begin the installation Use extreme caution and follow instructions carefully Install the components in the distribution box according to the wiring diagram below...

Страница 5: ...d complete the site 2 Equalizer Under Site Structure Add Equalizer Input Wifi information Scan Equalizer with your phone s NFC reader Connect Equalizer to the meter reader Update Equalizer to at least...

Страница 6: ...und on the Eastron meter by clicking on U I and scrolling to ampere values A Is the charger already installed If the charger is already installed you will need to be invited as an administrator to acc...

Страница 7: ...hing No WiFi added3 Red flashing No data from power meter4 Red breathing every 10s Error5 Purple breathing every 10s Offline operation6 Touch the Easee logo in the middle to check power consumption Bl...

Страница 8: ...of Easee AS Easee and all other Easee product names and slogans are trademarks or registered trademarks of Easee AS Easee products can be protected by one or more patents All other products and servic...

Отзывы: