background image

EARTHSTONE OVENS PRE-ASSEMBLED GAS OVEN INSTALLATION INSTRUCTIONS 

 

      

       16 

 
 

GAS FIRE START-UP PROCEDURES 

 

 

 

MAKE SURE ALL POWER PLUGS ARE CONNECTED. 

 

 

GAS PRESSURE, BEFORE OVEN VALVE, SHOULD BE 7” W.C. FOR NATURAL GAS 
AND 10” W.C. FOR LP GAS.  GAS FIRE MANIFOLD PRESSURE IS SET AT THE 
FACTORY.  PLEASE SEE CHART ON THE BOTTOM OF PAGE 2. 

 

 

ADEQUATE CLEARANCE MUST BE PROVIDED FOR AIR OPENINGS INTO THE 
COMBUSTION CHAMBER, FOR SERVICING AND PROPER OPERATION (PAG AND 
PAGW MODELS ONLY). 

A MIIMUM OPEIG OF 24” X 24” MUST BE LOCATED 

O THE BOTTOM HALF OF THE OVE.  THIS AREA CAOT BE BLOCKED

 

 

 

CHECK TO SEE THAT MAIN GAS VALVE ON GAS BURNER CONTROLLER BOX IS 
ON. 

 

 

SET TEMPERATURE CONTROLLER TO BELOW 200 DEGREES BY HOLDING DOWN 
RED BUTTON AND TURNING BLACK KNOB COUNTER CLOCKWISE TO DECREASE 
AND CLOCKWISE TO INCREASE. 

 

 

REMOVE OVE DOOR.  THE DOOR SHOULD OT BE CLOSED WHE OVE IS 
FIRED.  WITH A 2 SIDED OVE YOU CA HAVE OE DOOR CLOSED. 

 
 

 

MOVE HI/LO – HI/OFF SWITCH TO “HI/LO”. (UPWARD CLICK) 

 

 

TURN ON/OFF SWITCH TO “ON”.  INITIALLY OVEN MAY NEED TO BE TURNED ON 
AND OFF 4 OR 5 TIMES (IN 1 SECOND INTERVALS) IN ORDER TO BLEED THE GAS 
PIPE. 

 

 
 

CLICK “ON” WAIT 1 SEC, TURN OFF. 

 

CLICK “ON” WAIT 1 SEC, TURN OFF. 

 
 

LONGER PIPE LENGTHS MAY REQUIRE MORE BLEEDING. 

 

ALLOW OVE TO FIRE FOR AT LEAST 5 HOURS AT LOW FLAME FOR 2 DAYS 

 

AFTER 2 DAY FIRIG ADJUST TEMPERATURE TO ORMAL OPERATIG RAGE 600F-750F 
 

Oven curing is a process of removing moisture from the oven that has accumulated during 
the oven installation. If you still see moisture from the oven you may need to cure the oven 
for a few more days.  Improper curing may cause small pieces of the oven to pop.  Although 
this is not harmful to the oven in anyway, please follow these procedures. 
 

Содержание GAS FIRED OVEN

Страница 1: ...ROMINENT LOCATION FOR YOUR SAFETY DO NOT STORE OR USE GASOLINE OR OTHER FLAMMABLE LIQUIDS OR VAPORS IN THE VICINITY OF THIS OR ANY OTHER APPLIANCE WAR I G IMPROPER INSTALLATION ADJUSTMENT ALTERATION S...

Страница 2: ...GRAM IS LOCATED ON THE CONTROL BOX INSTALLATION MUST CONFORM WITH LOCAL CODES OR IN THE ABSENCE OF LOCAL CODES WITH THE NATIONAL FUEL GAS CODE ANSI Z223 1 THE NATURAL GAS INSTALLATION CODE CAN CGA B14...

Страница 3: ...STRUCTIONS CAREFULLY IMPROPER USE OF THIS APPLIANCE MAY RESULT IN A BUILDING FIRE OR PERSONAL INJURY INSTRUCTIONS MUST BE READ AND THOROUGHLY UNDERSTOOD BY ALL OPERATING AND SUPERVISING PERSONNEL WATC...

Страница 4: ...TE SIDE OF THE GAS BURNER SEE DIAGRAM WOOD SHOULD BE USED ONLY FOR FLAVORING AND AESTHETIC VALUE THE MAIN SOURCE OF HEAT SHOULD BE SUPPLIED BY THE GAS BURNER KEEP A PROPER FIRE EXTINGUISHER CLOSE TO T...

Страница 5: ...d container closed at all times when not adding or removing firewood Keep container a considerable distance from the oven and far away from sources of heat or ignition DO NOT store matches paper or ot...

Страница 6: ...ced chimney and duct servicing personnel who are qualified in the removal of both creosote and grease from flues and ducts should be contracted to do the inspection and cleaning The inspection and cle...

Страница 7: ...URNER FOR CLEANING FOLLOW THESE STEPS DISCONNECT CABLE FROM SPARK IGNITER UNSCREW FITTING OF GAS SUPPLY LINE WHICH IS NEAREST TO BURNER ASSEMBLY THIS SUPPLY LINE CONNECTS THE GAS VALVE TO BURNER ASSEM...

Страница 8: ...OR COUNTER CLOCKWISE 5 RED BUTTO USED SIMULTANEOUSLY WITH BLACK DIAL KNOB TO SET TEMPERATURE SEE PAGE LABELED SWITCH DIAGRAM LAYOUT OPERATION FIRI G OVE OTE DO OT CLOSE DOOR WHILE OVE IS BEI G FIRED...

Страница 9: ...USE ANY CLEANING AGENTS IN THE OVEN SHUTTI G DOW OVE TURN MAIN POWER SWITCH TO OFF POSITION IF OVEN IS BEING SHUT DOWN FOR THE NIGHT GAS CONTROL VALVE SHOULD BE TURNED TO OFF POSITION SAVE THESE I STR...

Страница 10: ...EARTHSTONE OVENS PRE ASSEMBLED GAS OVEN INSTALLATION INSTRUCTIONS 10 GAS BURNER CONTROLS E S ARTH TONE LOS ANGELES OFF ON HI LO HI OFF 000 1 2 3 4 5...

Страница 11: ...en may cause negative pressure servicing proper operation If this area is to be covered with a facade it must be of a non combustable material Temperature gauge and On off switch can be extended to at...

Страница 12: ...STALLATION INSTRUCTIONS 12 GAS BURNER WOOD All wood fired in a gas wood combination o ven should be located on the opposite side of the gas bu rner Take caution to avoid ashes from entering the gas bu...

Страница 13: ...EARTHSTONE OVENS PRE ASSEMBLED GAS OVEN INSTALLATION INSTRUCTIONS 13 LOG CONFIGURATION TOP VIEW SIDE VIEW LOG 1 1 LOG HAS A NOTCH TO SUPPORT LOG FROM ROLLING OFF LOWER SUPPORT LOG...

Страница 14: ...opening needed for combustion air Only one intake should be installed located in the front or back of oven Gas Burner system Air flow Roof False Ceiling Air flow Air flow 24 x24 opening needed for co...

Страница 15: ...sure below where the gas burner is located The air underneath will travel towards the air flow above creating a suction which will force the gas flame downwards To prevent this a non combustable lid m...

Страница 16: ...ER CLOCKWISE TO DECREASE AND CLOCKWISE TO INCREASE REMOVE OVE DOOR THE DOOR SHOULD OT BE CLOSED WHE OVE IS FIRED WITH A 2 SIDED OVE YOU CA HAVE O E DOOR CLOSED MOVE HI LO HI OFF SWITCH TO HI LO UPWARD...

Страница 17: ...d Pressure The amounts listed below are set at the factory Natural Gas Manifold pressure 90 PAGW 4 W C 110 PAGW 4 W C 130 PAGW 4 5 W C 160 PAGW 4 5 W C LP Gas Manifold pressure 90 PAGW 7 W C 110 PAGW...

Отзывы: