Step 5:
Measure and cut copper tubing to connect the liquid line from the TXV control box to the liquid
line stub out on the cased coil as shown in Figures 7 and 13. Run the other liquid line from the
connection on the TXV control box to the compressor unit, also shown in Figure 13. Nitrogen braze the
joints.
Step 6:
Replace the core in the Schrader valve and connect the pressure equalizer tube to the Schrader
valve. Tighten the flare connection firmly.
Wrap the liquid and vapor tubing including the liquid line
tubing to the TXV control box, with Armaflex
®
, Insul-Tube
®
or equivalent insulation of at least ½”
wall thickness, between the cased coil and compressor unit.
Figure 13. TXV Liquid Line Connections
Содержание CCA Series
Страница 1: ...CCA 410 IM 03 15 Page 1 EarthLinked CCA Series Cased Coils Installation Manual ...
Страница 10: ...CCA 410 IM 03 15 Page 10 Figure 6 Cased Coil and Air Handler Line Set Separation ...
Страница 18: ...CCA 410 IM 03 15 Page 18 Figure 11 Clamping the Thermal Bulb Figure 12 Insulating the Thermal Bulb ...
Страница 22: ...CCA 410 IM 03 15 Page 22 ...
Страница 23: ...CCA 410 IM 03 15 Page 23 ...
Страница 24: ...CCA 410 IM 03 15 Page 24 Appendix B CCA Series CE Parts List ...
Страница 25: ...CCA 410 IM 03 15 Page 25 ...
Страница 26: ...CCA 410 IM 03 15 Page 26 ...